How to Cost an Evaluation, Line by Line

On This Page

Cost the Work, Not a Percentage

This page is for pricing a single evaluation. It starts from the work the evaluation needs and adds up the cost. It does not start from a share of the program budget. For how much of a whole program budget to set aside for measurement, and the lines of the overall plan, see M&E budget and the M&E budget allocation guide. For the survey costs of routine monitoring, see data collection budget.

A percentage is a ceiling to check against, not a way to build a cost. Two evaluations of the same program can differ several times over in cost, because the cost depends on the questions, the design, the sample, the number of sites, the languages and the team. Settle those first.

What Decides the Cost?

Five choices drive most of the price. Fix them before pricing anything.

DriverThe Question to SettleWhy It Moves the Cost
Evaluation questionsHow many, and how deep?More questions mean more instruments and more analysis days
Design and methodsSurvey, interviews, focus groups, or a mix?A survey adds enumerators, devices and training; qualitative work adds transcription
Sample and sitesHow many respondents, in how many places?Sample size sets fieldwork days; scattered sites add travel
LanguagesHow many, and is translation needed?Each language adds tool translation, interpreters and report translation
TeamWhich roles, and how many days each?Fees are usually the largest block

If the design is not yet fixed, price two options and show the gap. That tells the commissioner what each choice buys.

The Lines of an Evaluation Budget

Most evaluation budgets need the lines in the table. A missing line is a gap to explain, not a saving.

LineWhat to CountBasis
Team leader and methodological leadDays by phaseDays times daily rate
Analysts and national expertsDays by phaseDays times daily rate
Inception and desk reviewDays within the lines aboveIncluded in fee days
Enumerator and supervisor payPeople, training days, pilot days, field daysPeople times days times rate
Enumerator training and pilotVenue, materials, trainer timeLump sum or per day
Transport and fuelVehicles, days, distancesVehicles times days times rate
Lodging and per diemStaff in the field, nightsPeople times days times rate
Devices and softwareUnits rented or bought, licensesUnits times unit price
Translation and interpretationTools, transcripts, reportsWords or days
Qualitative costsVenues, refreshments, recording, transcriptionPer interview or group
Participant costsTransport refunds, childcare, accessibilityPer participant
Validation and sharingWorkshop venue and materials, disseminationLump sum or per participant
Editing and designReport editing, formattingLump sum
Ethics review and permitsFees and the time to obtain themLump sum
Quality assuranceBack-checks, external reviewDays or lump sum
ContingencyA stated share, held in reservePercentage of the lines above

Costs that do not appear as a cash line still count. Program staff time to support the evaluation, an evaluation reference group, and vehicles lent by the program are real costs. Record them as in-kind so the commissioner knows what the program is contributing.

How to Price a Line

Fees. Estimate days by phase (inception, data collection, analysis, reporting) for each role, then multiply by the daily rate. Ask who needs to be present at which phase, not how many weeks the contract runs.

Fieldwork. Work from the sample: respondents divided by interviews per enumerator per day gives enumerator-days. Add training and pilot days, and add days for revisits where respondents are not home. Supervisors are priced separately and should not also appear as enumerators.

Quantities and unit costs. Write the quantity and the unit cost in separate columns so anyone can change either. A line with only a total cannot be checked.

Rates. Use local rates for national staff and travel. State the currency and the date of the rates.

Steps to Build the Budget

  1. List the evaluation questions and the methods that answer them.
  2. Fix the sample, the sites and the languages.
  3. Work out fee days for each role and phase.
  4. Work out fieldwork days from the sample.
  5. Price every line with a quantity and a unit cost.
  6. Add the lines that are easy to forget: training, pilot, translation, transcription, accessibility and quality assurance.
  7. Add contingency as a stated share.
  8. Check for double counting, for example staff in both the fee lines and the fieldwork lines.
  9. Compare the total with the money available and with any bids, and explain the gaps.

Worked Example: Healthy Futures Endline

Healthy Futures is a fictional child nutrition program. Its endline evaluation uses a survey of 600 households, nine focus groups, and a validation workshop. All figures are invented to show the method.

LineQuantityUnit CostAmount
Team leader40 days$400$16,000
Survey analyst30 days$300$9,000
Qualitative researcher25 days$250$6,250
Enumerators (3 training and pilot days, 12 field days)12 people x 15 days$20$3,600
Supervisors3 people x 15 days$35$1,575
Vehicles and fuel2 vehicles x 12 days$90$2,160
Per diem in the field15 people x 12 days$25$4,500
Tablet rental15 tablets$40$600
Tool translation (2 languages)2$400$800
Focus group costs9 groups$150$1,350
Validation workshop25 participants x $20, plus venue $300$800
Report editing and design1$1,200$1,200
Ethics review and permits1$400$400
Subtotal$48,235
Contingency10% of subtotal$4,824
Total$53,059

Fees are $31,250 of the $48,235 subtotal, about 65%. The 10% contingency is a choice made for this example, not a standard.

Checks. The 600 households need 12 enumerators for 12 field days at 4 to 5 interviews per enumerator per day, so 12 x 12 x 4.2 is about 600. Enumerators are counted once, in the survey lines, and not again in the fee lines. Each of the 15 people in the field gets a per diem for 12 days. Training and pilot days are paid but have no per diem, because they run at the base.

When the Price Is Above the Money

If the total is above the budget, change the scope openly. Do not remove quality lines quietly. In rough order of what hurts least:

  • Reduce the number of evaluation questions.
  • Reduce the sample, and state the precision that results.
  • Reduce the number of sites, and say which are left out.
  • Use existing program data for some indicators.
  • Run fewer qualitative groups or interviews.

Keep training, piloting and quality assurance. Cutting them saves little, and the cost shows up as unusable data. Put the scope and the price in the terms of reference together, so bidders price the same work.

Common Mistakes

  • Starting from a percentage of the program budget and working backward.
  • Pricing fee days for the length of the contract instead of the work.
  • Forgetting training, pilot, translation, transcription and accessibility costs.
  • Counting enumerators in both the fieldwork and the fee lines.
  • Giving only totals, so nobody can check or change a line.
  • Leaving out contingency, then absorbing overruns by cutting quality.

Last updated October 23, 20262 sources checked

M&E Studio also does this work for clients.

The team that writes and reviews this library takes on M&E system design, evaluation quality reviews, AI advisory and workflow automation.

See services
Also known as

evaluation budget, how much does an evaluation cost, evaluation cost estimate, budgeting an evaluation