Review a ToR Budget

Review the actual evaluation budget/ceiling with TOR scope/methods, quantities/effort, schedule, currency/tax basis, dated cost evidence and procurement/funding rules. Request missing content before cost judgments; names are not rates or rules.

Check internal scope/quantity/effort/cost consistency. Assess market realism only from relevant dated quotes/benchmarks, otherwise unverified. A published TOR may legitimately give only a ceiling; do not demand confidential internal breakdowns. Check necessary personnel/travel/collection/analysis/reporting/overhead, context-specific sites/days and field rates, plus relevant translation/transcription/ethics/dissemination/production without assuming universal fees or double counting.

Assess contingency only where rules permit, with priced risk rationale and authorization; no default percentage or penalty for a prohibited line. Return short assessment, located dimension/rating/evidence/action table, prioritized revisions and conditional readiness advice. Use Meets, Needs Revision, Not Assessable or reasoned Not Applicable, numerical anchors only if supplied. Continue supported parts; unknown rates remain unknown rather than invented affordability or approval.

Choose This Prompt When
Use this to review an evaluation ToR's resource envelope. Choose Review ToR Readiness for the full solicitation, or Review a Budget vs Actuals Narrative for spending against an approved budget.
Loading saved answers...

Worked Example

Illustration only. The setting and figures are invented to show the pattern.

Scenario: A midline evaluation ToR for a regional water and sanitation program states a budget ceiling of 90,000 USD. The commissioning team wants to know before issue whether the ceiling can buy the scope.

What You Give the AI: The ceiling and its currency, the scope and methods section (a household survey of 1,200 households, 12 focus groups, a team of two evaluators), a six-week fieldwork schedule, and a note that the ceiling includes tax. No quotes or past contract rates are attached.

What the AI Might Return: An overall rating of Needs Revision, with the table showing why. The survey row finds that 1,200 interviews in six weeks imply a field team size the budget never mentions. The translation row is flagged as missing from scope and cost alike. Market realism reads Not Assessable because no dated quotes were supplied. A readiness note says the ToR can issue once team size and translation are settled.

When to Choose This Prompt

  • You hold a draft ToR and want to know whether the budget or ceiling fits the scope and methods before bidders see it.
  • Quantities, schedule and budget came from different people and may disagree.
  • You want a list of cost lines that the scope implies but nobody has priced.

When Not to Choose It

Checking the Output

  • Take each quantity in the scope (sites, interviews, days) and find it again in the AI's table. Any figure it quotes that your ToR does not contain was made up.
  • Where the AI calls a rate realistic or low, look for the dated quote or benchmark you supplied. With none, the rating should read unverified.
  • A ceiling-only ToR is legitimate. If the review demands a line-item breakdown from you, it has misread the document.
  • Read the contingency comment against your funding rules. It should depend on what those rules allow and give a reason tied to a risk.
  • Scan for double counting, such as training days in both personnel and fieldwork.
  • Each rating should cite its evidence in your text.

Common Problems and Fixes

  • The AI names typical day rates or percentages from memory. Fix: Use only the rates in your attachment and mark everything else Not Assessable.
  • It rates the budget as sufficient without knowing the currency or tax basis. Fix: State both in your input and ask it to hold cost judgments until it has them.
  • The review treats a missing breakdown as a defect. Fix: Say the ToR is published with a ceiling only, and ask for a check of scope against that ceiling.
  • The output is a long essay with no table. Fix: Ask for the located table (dimension, rating, evidence, action) and a short list of priority revisions.

Adapting It to Your Context

  • Evaluation with heavy remote data collection: Give the platform, license and enumerator payment arrangements so costs are not assumed from a field model.
  • Strict procurement rules on contingency: Paste the rule text and ask whether a contingency line is allowed at all before size is discussed.
  • Several lots or phases: Review one lot at a time and give the shared costs separately.
  • Budget set by the funder before the design was done: Ask for a ranked list of what to cut if the scope cannot change.