Create an M&E Budget

Build an activity-based MEAL budget for the supplied program. If activities, period, currency, or a basis for rates are missing, ask for them before giving a priced total. Never invent a local rate or call an unsupported figure realistic.

Provide a line-item table with activity, unit, quantity, unit cost, currency, calculation, funding source or cost evidence, and status as confirmed or estimate. Cover only applicable collection, staffing, analysis, reporting, accessibility, data protection, feedback, learning, travel, equipment, and contingency costs. Explain shared costs and possible double counting. Sum subtotals and the total only where all necessary figures exist; otherwise give a clearly unpriced costing worksheet and list needed quotes. Compare with any ceiling and applicable agreement terms without assuming a universal percentage. Add a short narrative on cost drivers, assumptions, equity and access needs, and overrun risks.

Include risks of both overspending and underuse, with checks or approvals needed before reallocating funds.

Preserve conflicting cost records with their sources and mark pricing unresolved until reconciled.

Choose This Prompt When
Choose this to cost MEAL work; choose the proposal MEAL section for a concise narrative and high-level budget linked to a bid.
Loading saved answers...

Worked Example

Illustration only. The setting and figures are invented to show the pattern.

Scenario: A two-year nutrition program in three rural districts needs its MEAL costs worked out before the budget is locked. The total ceiling is set, but nobody has priced the activities.

What You Give the AI: The MEAL workplan with a baseline, two monitoring rounds a year and an endline; staff positions and days; the three districts; the currency; the ceiling; a salary scale; and a quote from one data collection vendor.

What the AI Might Return: A line-item table where each row has activity, unit, quantity, unit cost, calculation, evidence and a status of confirmed or estimate. Staff and survey rows are priced because rates were supplied. Training venue and translation rows are left unpriced, with a list of quotes to request. A comparison shows the priced subtotal against the ceiling. A short narrative names the cost drivers, such as district travel, and flags a risk of underspending if the endline slips.

When to Choose This Prompt

  • You have a MEAL workplan and need each activity costed with the calculation visible.
  • You must test the plan against a budget ceiling or a binding agreement before it goes into a bid or an annual budget.
  • You want a costing worksheet that shows which prices are real and which are still missing.

When Not to Choose It

Checking the Output

  • A handful of rows is enough to recalculate by hand. Quantity times unit cost should equal the line total.
  • Every unit cost needs matching against your own rate sheet, salary scale or quote. A rate you did not supply should be marked unconfirmed or left blank.
  • Check the quantities against the workplan. Rounds, sites and enumerator days should match what you described.
  • Look for double counting between shared costs such as vehicles, supervisors and training days.
  • Your ceiling and any pasted agreement terms are the test for the total. Watch for percentages the AI added on its own.
  • The reallocation checks should say who approves a move between lines before money is shifted.

Common Problems and Fixes

  • A total appears even though several prices are missing. Fix: Switch to an unpriced worksheet with a quotes-needed list, and total only the rows that have evidence.
  • Local rates are described as realistic without any source. Fix: Strike the claim and mark each rate as supplied, quoted or assumed.
  • The same cost sits in two lines, for example a field vehicle in both data collection and supervision. Fix: Add a note on each shared cost saying which line carries it.
  • Accessibility, data protection and feedback costs are missing. Fix: Have the plan checked for them, adding only those that apply, with the reason.

Adapting It to Your Context

  • Fixed ceiling from a funder: Paste the ceiling and the exact clause. Ask for what drops out first if the priced total goes over it.
  • Multi-currency program: Name the budget currency and the exchange rate with its date, and ask for conversions to be shown on each line.
  • Early stage with no quotes: Without quotes, request an unpriced worksheet listing the quantities and the quotes still to be obtained.

Next Step

Review M&E Budget Adequacy