Commission an answerable evaluation

Aligned questions, evidence matrix and terms of reference, revised within actual time and resource constraints.

Bring these inputs

Input types: Program documents; Evaluation tor; Evaluation questions. Use source documents and evidence you are authorized to share. A missing input is a question or a stop, never permission to invent facts.

Minimum inputs

  • Evaluation purpose, program scope and intended users
  • Evidence access, timetable and actual resources

Useful if available

  • Existing questions, TOR or commissioning agreement
  • Actual team, ethics and access arrangements

Decisions you must make

  • Confirm core and optional questions and their intended use.
  • Agree consequential scope, budget, access and schedule decisions.

Start in Claude or ChatGPT

Choose how to work, inspect the instructions, then copy them to your own assistant. These controls stay in page memory and reset when you leave. This page does not accept or save your documents, run AI or send these choices.

Task instructions are available in English and Spanish. Each source method keeps its declared language and provenance; methods without an accepted Spanish edition are labeled English and supplied unchanged.

24,249 characters

Inspect exact instructions: Copy Task Starter

This is the complete text used by this copy control. No documents or settings are sent by this page.

Paste the starter first. It includes intake, the ordered task plan and the exact method for your selected branch, or the default method for your working mode. It asks for the required inputs and decisions before proceeding. Copy each later stage when its required artifacts are ready. Keep the artifacts in your own files; a new chat cannot recover them from this page.

Your chosen assistant processes anything you provide under its own account settings, policies, capabilities and limits. Follow your organization's rules and remove names or sensitive details before sharing material. Check its actual file-reading and output abilities; account access or a copied method does not prove a successful run.

See Claude setup and limits

Work through the stages

Each stage names the artifact that the next stage needs. Keep its source references, assumptions, unresolved issues and version label together. Do not continue past a substantive stop or silently treat a draft as accepted.

Stage · evaluation-questions

Prioritize evaluation questions

Develop or refine answerable questions tied to actual users and decisions.

Bring to this stage

  • source-map
  • input-material

Keep this artifact

  • evaluation-questions

Check before moving on

  • Keep core and optional priorities explicit; do not invent user agreement.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: evaluation-questions. Full source text, revision and digest are included in the copied instructions.

24,252 characters

Inspect exact instructions: Copy Prioritize evaluation questions Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · question-method-alignment

Align questions and methods

Connect question IDs to evidence, methods, criteria, access conditions and feasibility.

Bring to this stage

  • source-map
  • input-material
  • evaluation-questions

Keep this artifact

  • evaluation-matrix

Check before moving on

  • Conditional access remains conditional.
  • Task days must fit the cap; field dates must fit the window.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: question-method-alignment. Full source text, revision and digest are included in the copied instructions.

23,795 characters

Inspect exact instructions: Copy Align questions and methods Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · evaluation-tor-draft

Draft commissioning terms

Use agreed questions and matrix to draft coherent requirements. Effort, owners and dates are proposals unless confirmed.

Bring to this stage

  • source-map
  • input-material
  • evaluation-questions
  • evaluation-matrix

Keep this artifact

  • tor-draft

Check before moving on

  • Keep question IDs, priorities and schedule aligned.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: evaluation-tor-draft. Full source text, revision and digest are included in the copied instructions.

24,722 characters

Inspect exact instructions: Copy Draft commissioning terms Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · tor-review

Review the commissioning set

Check answerability, requirements, feasibility, ethics, team, budget and deliverables. After revision synchronize changed questions, matrix rows and schedule.

Bring to this stage

  • source-map
  • input-material
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • review-issues

Check before moving on

  • Unresolved access or budget assumptions are not commitments.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: tor-review. Full source text, revision and digest are included in the copied instructions.

36,730 characters

Inspect exact instructions: Copy Review the commissioning set Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Use a branch only when it fits

Optional branch · evaluation-inception-draft-evaluation-tor

Draft evaluation tor

Use when: The evaluation is commissioned and inception is being prepared. Follow the maintained evaluation-inception sequence. If a governing TOR exists, use it as the supplied first-stage artifact instead of redrafting. Review readiness, agree changes, prepare the matrix, then draft and check inception only with actual commissioner/evaluator agreements.

Provide the actual evaluation purpose, program context, intended use and practical constraints. Required handoff: Draft terms of reference with explicit requirements and unresolved decisions. Use an existing governing artifact when supplied; do not redraft it automatically.

Bring to this stage

  • source-map
  • input-material
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • inception-tor

Check before moving on

  • Resolve the readiness and inception-review findings with the responsible parties. A draft does not replace approval of scope, methods, access or ethics.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: draft-evaluation-tor. Full source text, revision and digest are included in the copied instructions.

18,881 characters

Inspect exact instructions: Copy Draft evaluation tor Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Optional branch · evaluation-inception-review-tor-readiness

Review tor readiness

Use when: The evaluation is commissioned and inception is being prepared. Follow the maintained evaluation-inception sequence. If a governing TOR exists, use it as the supplied first-stage artifact instead of redrafting. Review readiness, agree changes, prepare the matrix, then draft and check inception only with actual commissioner/evaluator agreements.

Supply the draft terms of reference and the evidence and constraints needed to judge feasibility. Required handoff: Readiness gaps and priority changes before commissioning or design proceeds. Use an existing governing artifact when supplied; do not redraft it automatically.

Bring to this stage

  • source-map
  • input-material
  • inception-tor
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • inception-readiness-review
  • evaluation-inception-review-issues

Check before moving on

  • Resolve the readiness and inception-review findings with the responsible parties. A draft does not replace approval of scope, methods, access or ethics.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: review-tor-readiness. Full source text, revision and digest are included in the copied instructions.

18,513 characters

Inspect exact instructions: Copy Review tor readiness Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Optional branch · evaluation-inception-design-evaluation-matrix

Design evaluation matrix

Use when: The evaluation is commissioned and inception is being prepared. Follow the maintained evaluation-inception sequence. If a governing TOR exists, use it as the supplied first-stage artifact instead of redrafting. Review readiness, agree changes, prepare the matrix, then draft and check inception only with actual commissioner/evaluator agreements.

Revise and agree the terms of reference first, then provide the evaluation questions, evidence access and design constraints. Required handoff: A matrix connecting questions, judgment criteria, evidence, methods and analysis. Use an existing governing artifact when supplied; do not redraft it automatically.

Bring to this stage

  • source-map
  • input-material
  • inception-tor
  • inception-readiness-review
  • evaluation-inception-review-issues
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • inception-matrix

Check before moving on

  • Resolve the readiness and inception-review findings with the responsible parties. A draft does not replace approval of scope, methods, access or ethics.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: design-evaluation-matrix. Full source text, revision and digest are included in the copied instructions.

19,796 characters

Inspect exact instructions: Copy Design evaluation matrix Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Optional branch · evaluation-inception-draft-evaluation-inception

Draft evaluation inception

Use when: The evaluation is commissioned and inception is being prepared. Follow the maintained evaluation-inception sequence. If a governing TOR exists, use it as the supplied first-stage artifact instead of redrafting. Review readiness, agree changes, prepare the matrix, then draft and check inception only with actual commissioner/evaluator agreements.

After commissioning, provide the agreed terms of reference, reviewed evaluation matrix, design decisions, actual team capacity and access arrangements. Required handoff: An inception-report draft that makes methods, workplan, responsibilities and limitations explicit. Use an existing governing artifact when supplied; do not redraft it automatically.

Bring to this stage

  • source-map
  • input-material
  • inception-tor
  • inception-readiness-review
  • evaluation-inception-review-issues
  • inception-matrix
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • inception-report-draft

Check before moving on

  • Resolve the readiness and inception-review findings with the responsible parties. A draft does not replace approval of scope, methods, access or ethics.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: draft-evaluation-inception. Full source text, revision and digest are included in the copied instructions.

19,652 characters

Inspect exact instructions: Copy Draft evaluation inception Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Optional branch · evaluation-inception-review-inception-report

Review inception report

Use when: The evaluation is commissioned and inception is being prepared. Follow the maintained evaluation-inception sequence. If a governing TOR exists, use it as the supplied first-stage artifact instead of redrafting. Review readiness, agree changes, prepare the matrix, then draft and check inception only with actual commissioner/evaluator agreements.

Supply the inception draft, agreed terms of reference and supporting design and workplan material. Required handoff: Located design and feasibility findings, with prioritized revisions. Use an existing governing artifact when supplied; do not redraft it automatically.

Bring to this stage

  • source-map
  • input-material
  • inception-tor
  • inception-readiness-review
  • evaluation-inception-review-issues
  • inception-matrix
  • inception-report-draft
  • evaluation-questions
  • evaluation-matrix
  • tor-draft

Keep this artifact

  • inception-report-review
  • evaluation-inception-review-issues

Check before moving on

  • Resolve the readiness and inception-review findings with the responsible parties. A draft does not replace approval of scope, methods, access or ethics.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: review-inception-report. Full source text, revision and digest are included in the copied instructions.

18,939 characters

Inspect exact instructions: Copy Review inception report Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Revise or resume without losing decisions

Revise after the task review

Each review issue needs a stable ID, artifact/location, source or method basis, consequence and actionable correction. Record accept, reject or amend with a reason and decision/source ID. Preserve the original v1, create v2 and retain unresolved issues. Proposed changes are not accepted decisions. Rerun the affected source-method checks and cross-artifact checks; preserve both changed and unchanged commitments.

Use this combined copy after the task review. To revise an earlier artifact, choose Revise with decisions and copy its own stage instructions above. Bring the original, applicable review and issue dispositions. Later artifacts that do not exist remain unperformed.

Bring back

  • source-map
  • named-draft-to-revise
  • corresponding-issue-register
  • issue-dispositions

Already-produced context, when available

  • evaluation-questions
  • evaluation-matrix
  • tor-draft
  • inception-tor
  • inception-readiness-review
  • evaluation-inception-review-issues
  • inception-matrix
  • inception-report-draft
  • inception-report-review
  • evaluation-inception-review-issues

Bring only context that was actually produced and branch artifacts from selected branches. Retain their names and versions during revision.

Version names for supplied revision targets

These are naming choices, not a requirement to create every artifact. Revise only the named draft you supplied.

  • evaluation-questions to evaluation-questions-v2
  • evaluation-matrix to evaluation-matrix-v2
  • tor-draft to tor-draft-v2
  • review-issues to review-issues-v2
  • inception-tor to inception-tor-v2
  • inception-readiness-review to inception-readiness-review-v2
  • evaluation-inception-review-issues to evaluation-inception-review-issues-v2
  • inception-matrix to inception-matrix-v2
  • inception-report-draft to inception-report-draft-v2
  • inception-report-review to inception-report-review-v2

Preserve

  • Original supplied sources and every original named draft
  • Stable question, indicator, finding and issue IDs

Produce

  • versioned-selected-drafts
  • change-record
  • unresolved-decisions
42,185 characters

Inspect exact instructions: Copy Revision and Disposition Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Continue in a new chat

Bring the latest named artifact, source inputs, issue list, decision dispositions and the method text for the next stage. State what passed, failed or remains unperformed. The assistant must inspect those materials and confirm the next step before continuing.

2,169 characters

Inspect exact instructions: Copy Resume Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Finish with a usable output

  • Return usable named deliverables, source/decision notes, limitations, unresolved issues and the change record. Check repeated IDs, definitions, periods, denominators, citations and arithmetic across artifacts. A documented unsuitable-input decision or an unexecuted specification can be the honest usable outcome.
  • Distinguish unperformed, blocked, proposed and checked work. Never claim fieldwork, computation, pilot completion, approval, causal identification, file generation or host capability without actual evidence.
  • Use the review and dispositions to produce the final revised set. Retain unresolved decisions and proposed commitments visibly.

Keep the source inputs, named artifacts, checks, decisions and final version together. A draft, an accepted decision, a checked calculation and a created file are separate facts. Mark any unperformed check clearly.

A fictional transition

Fictional case: 40 field days are proposed inside a 20-day window and access is unconfirmed. Present scoped options and synchronize the question set and matrix after the decision.

This small illustration is fictional. It is not an observed assistant result or real project evidence.

Source resources and optional assets

The task connects existing methods and keeps their criteria. Copied stage instructions contain the resolved method text and its source identity. Adaptations are labeled separately. Resources are in English unless a resource explicitly says otherwise. Earlier install packages may contain different bytes from the current portable methods. Source projection, installation, host checks and publication are separate facts.

Skill · English

Evaluation Questions

Prioritize answerable questions tied to the decisions an evaluation must support.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: ed61ec747b29e433bb57a893b73836db6d29c11e13751093469274556cf3638d
Source-file SHA-256: 33ed43e6c6b935958a7e6ebe62f021b97d158553166664976bc152c866150ae1
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

Question and Method Alignment

Match evaluation questions to feasible evidence, methods and limitations.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 8870dad2d466ef7623b55609c5ae8490613f8dcba65b42436a85ec686eac0f21
Source-file SHA-256: 8870dad2d466ef7623b55609c5ae8490613f8dcba65b42436a85ec686eac0f21
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

Evaluation TOR Draft

Draft a source-linked TOR with feasible scope and unresolved decisions visible.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 1699394ec5e445c81b771eb6f47ea831f8ef6f4aeefc27d0eba0c4f98ae9f6d4
Source-file SHA-256: 1699394ec5e445c81b771eb6f47ea831f8ef6f4aeefc27d0eba0c4f98ae9f6d4
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

Evaluation TOR Review

Review commissioning scope, methodological feasibility, ethics and deliverables.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 6119e62d7899d3f533b9dc0bec34268de426fcf29c9603833e1f8d921ba897b6
Source-file SHA-256: 041f05c8617d0066eca90236f7f0106b0744e9bfd670f5f15d7f33f7839363ff
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Prompt · English

Draft Evaluation Terms of Reference

Write terms of reference for commissioning an external evaluation, including scope, questions, and methodology.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: e7533eae2282975d3e8ec1f70c3099506543893d6adf2a74d364d68ce2ce80a7

2,029 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Review ToR Readiness

Review the evaluation ToR for clear purpose, defensible scope, feasible delivery and conditions still to resolve before issue.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 370311a103963baefa81caef687caf4a8abad935888e866d39e8bc3d42201985

1,547 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Design an Evaluation Matrix

Design an evaluation matrix showing how the actual priority questions will be answered and judged.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: cbb147fe32b2886a290ca5a912af352ecced0e8abc52ec7a5a3f08b71750520f

2,805 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Draft an Evaluation Inception Report

Draft a structured evaluation inception report outline covering methodology, workplan, evaluation matrix, risk assessment, team composition, and logistics.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: bf4f71993963d8f1c4d4ca1e17b1ca50f4de76cc5d490516d7ab468118a9c6b5

2,578 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Review an Inception Report

Review the inception report’s design and safeguards, identifying conditions for the responsible owner before fieldwork.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 0de82af0a0db344261007b78ad01b35255c94d77eeb5e8da60e51988ea0077b9

1,865 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Workflow · English

Evaluation Planning

Move from evaluation decisions to questions, methods and a revised TOR.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: c77cdf927ad000933698d18335173d5c2352a69a5140b447498e0332b22c1bcf
Source-file SHA-256: 972d1aebdc43e03635532481bd80e402faadcf04358e5a3c07566e7900fd21e4
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Download · English · docx

Evaluation matrix guided template

Existing guided template. Adapt it to the actual task and requirements.

Source identity

Revision: existing-reference-download
File SHA-256: 69dfb099b1e8e930ccf315885493add0b269bb683e49347ad7da36edcd18350b

Download · English · pdf

Evaluation matrix worked example

Fictional worked material. Adapt its structure; do not treat example figures as program evidence.

Fictional example or template

Source identity

Revision: existing-reference-download
File SHA-256: 30d5e5f947cde1538654882887d12b70300d91a7943507674e6e8f0808a641a8

Download · English · docx

Inception report guided template

Existing guided template. Adapt it to the actual task and requirements.

Source identity

Revision: existing-reference-download
File SHA-256: fa1685520f885159a9f6db7d99114b2242f95065ebdd66fad025236d7af2c520

Download · English · pdf

Inception report worked example

Fictional worked material. Adapt its structure; do not treat example figures as program evidence.

Fictional example or template

Source identity

Revision: existing-reference-download
File SHA-256: c4c7ff7e5b22a5bf26e62a00c9cf3ec20bb3ff595cc08ccf28ff82a5551c3487

Browse all task kits and stand-alone resources