Draft an Evaluation Inception Report

Draft an evaluation inception report from my actual TOR, program evidence and commissioning instructions. Ask for substantive TOR/questions, intended users, scope, schedule and evidence when absent. A title or yes/no answer is not TOR content.

Follow supplied headings/order exactly, fitting content within them without conflicting defaults/annexes. Keep source provenance for conflicting instructions and ask which governs; titles do not establish authority. Preserve supplied effort, budget, access and calendar. Unconfirmed methods, sizes, roles, dates and approvals remain proposed.

Without a supplied format, include executive summary; background/purpose, users, program logic/interventions/population and geographic/thematic/time scope; question matrix; methods; workplan; team; risks; QA; and useful annexes. Fit detail to requested length.

Link answerable questions to relevant criteria, subquestions, indicators, sources, methods and judgment criteria. Consider all six OECD DAC criteria without requiring all. Justify design, sampling and methods for each question, allowing an adequate single method. Sample sizes require a frame, precision or qualitative rationale and resources; otherwise mark decisions pending. Include analysis, justified triangulation, gender/inclusion and consent/ethics.

Give phased Gantt activities/dates/roles/deliverables; team expertise/responsibilities/days; material methodological, operational, ethical/context risks with supported likelihood/impact/mitigation; internal review and proposed stakeholder validation. Apply standards only with relevant edition and commissioning status. Annex TOR-required or useful supplied instruments, consent, required CVs and sources actually used. Mark submission/approval pending.

Choose This Prompt When
Use this to draft an inception report after commissioning. Choose Draft an M&E Scope of Work before hiring, or Review an Inception Report to critique an existing draft.
Loading saved answers...

Worked Example

Illustration only. The setting and figures are invented to show the pattern.

Scenario: The final evaluation of a livelihoods program in three coastal districts has just been awarded to a new team. The commissioning agency wants an inception report in two weeks, in its own template.

What You Give the AI: The terms of reference, the program's results chain, the program period, the three districts, the team list with days per person, the evaluation budget, and the agency's template headings.

What the AI Might Return: A report that follows the agency's headings in the order given. The evaluation matrix has one row per question, with sub-questions, indicators, sources, methods and judgment criteria. The sampling section says that household numbers are pending until a district listing arrives. The workplan is a phased table with dates, roles and deliverables. Methods, roles and dates not yet confirmed are marked as proposed. A final list holds decisions for the commissioner, such as which of two conflicting deadlines applies.

When to Choose This Prompt

  • You have been commissioned and the terms of reference exist. The inception report is your next deliverable.
  • You want the evaluation matrix, methods, workplan and risks drafted in one pass so the team can edit one document.
  • The commissioner gave a template and you need your content fitted into its headings.

When Not to Choose It

Checking the Output

  • Headings come first: set them against the commissioner's template. Order and names should match exactly, with nothing added in the middle.
  • Compare each evaluation question with the terms of reference. Any wording change should be flagged.
  • Each sample size needs a stated frame, a precision target or a qualitative reason. If none was supplied it should read as pending.
  • Check the workplan dates and person-days against your contract and the team list you supplied.
  • Read the methods section for each question. A single adequate method is fine, and a long list of methods applied to every question is a warning sign.
  • Check that conflicting instructions between the terms of reference and the template appear as questions for the commissioner.

Common Problems and Fixes

  • The draft fills gaps with plausible details such as district names, interview counts or fieldwork weeks. Fix: Anything you did not supply should be marked proposed or pending, with those items listed at the end.
  • Every OECD DAC criterion is covered even where the terms of reference ask for a few. Fix: Name the criteria the commissioner requested, and have the rest dropped.
  • The workplan looks tidy but ignores seasons, holidays or access limits. Fix: Paste the calendar constraints you know and ask for dates to be rebuilt around them.
  • Gender and ethics appear as a closing paragraph. Fix: Move them inside the method for each question, with who consents and how.

Adapting It to Your Context

  • No commissioner template: Say so. The prompt then uses a standard structure, and you can cut sections to match the length the commissioner expects.
  • Short fieldwork window: Give the fixed dates and ask which questions the schedule can realistically answer, with the rest listed as limits.
  • Remote or insecure areas: Describe access and ask for remote data collection options and a risk table tied to them.

Next Step

Evaluation Inception Report Quality

Did this page help?