Make measurement feasible

An aligned indicator set, reference sheets and M&E plan with feasible collection burden and an explicit decision record.

Bring these inputs

Input types: Indicators; Results framework; M&E plan. Use source documents and evidence you are authorized to share. A missing input is a question or a stop, never permission to invent facts.

Minimum inputs

  • Results structure or indicators and required reporting obligations
  • Collection constraints, actual roles and available evidence

Useful if available

  • Existing reference sheets or M&E plan
  • Actual calendars, effort rates, budgets and approved responsibilities

Decisions you must make

  • Separate fixed obligations from changeable proposals.
  • Confirm calendar and capacity assumptions before presenting totals.

Start in Claude or ChatGPT

Choose how to work, inspect the instructions, then copy them to your own assistant. These controls stay in page memory and reset when you leave. This page does not accept or save your documents, run AI or send these choices.

Task instructions are available in English and Spanish. Each source method keeps its declared language and provenance; methods without an accepted Spanish edition are labeled English and supplied unchanged.

37,526 characters

Inspect exact instructions: Copy Task Starter

This is the complete text used by this copy control. No documents or settings are sent by this page.

Paste the starter first. It includes intake, the ordered task plan and the exact method for your selected branch, or the default method for your working mode. It asks for the required inputs and decisions before proceeding. Copy each later stage when its required artifacts are ready. Keep the artifacts in your own files; a new chat cannot recover them from this page.

Your chosen assistant processes anything you provide under its own account settings, policies, capabilities and limits. Follow your organization's rules and remove names or sensitive details before sharing material. Check its actual file-reading and output abilities; account access or a copied method does not prove a successful run.

See Claude setup and limits

Work through the stages

Each stage names the artifact that the next stage needs. Keep its source references, assumptions, unresolved issues and version label together. Do not continue past a substantive stop or silently treat a draft as accepted.

Stage · indicator-quality

Review indicator quality

Start with indicator-quality before reducing burden. Retain indicator IDs and distinguish required obligations from optional proposals.

Bring to this stage

  • source-map
  • input-material

Keep this artifact

  • indicator-review

Check before moving on

  • Check definition, unit, numerator, denominator, disaggregation, relevance and evidence gaps.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: indicator-quality. Full source text, revision and digest are included in the copied instructions.

37,522 characters

Inspect exact instructions: Copy Review indicator quality Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · measurement-feasibility

Test collection feasibility

Use actual constraints and the indicator review. Sum effort by role and actual month; separate recurring and one-time work. Preserve required evidence and reporting obligations when proposing reductions.

Bring to this stage

  • source-map
  • input-material
  • indicator-review

Keep this artifact

  • burden-and-decisions

Check before moving on

  • Do not count sessions as weeks or invent capacity.
  • Without calendar counts show rates and formulas; label hypothetical scenarios.
  • Keep missing cases distinct from confirmed negative cases and respondent-only denominators.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: measurement-feasibility. Full source text, revision and digest are included in the copied instructions.

24,499 characters

Inspect exact instructions: Copy Test collection feasibility Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · indicator-reference-sheets

Write reference sheets

Write a sheet for every retained indicator using agreed feasibility decisions. Label unknown baseline, source, frequency, access or owner.

Bring to this stage

  • source-map
  • input-material
  • indicator-review
  • burden-and-decisions

Keep this artifact

  • reference-sheets

Check before moving on

  • Carry identical IDs, definitions and denominators across sheets.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: indicator-reference-sheets. Full source text, revision and digest are included in the copied instructions.

24,298 characters

Inspect exact instructions: Copy Write reference sheets Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · me-plan-draft

Assemble the M&E plan

Build the plan from reference sheets and actual constraints. Mark proposed roles, access and resources as proposals.

Bring to this stage

  • source-map
  • input-material
  • indicator-review
  • burden-and-decisions
  • reference-sheets

Keep this artifact

  • me-plan

Check before moving on

  • Cover collection, verification, reporting, use, resources and responsibilities.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: me-plan-draft. Full source text, revision and digest are included in the copied instructions.

24,733 characters

Inspect exact instructions: Copy Assemble the M&E plan Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · me-plan-review

Check the complete measurement set

Compare every indicator across the plan, sheets, burden and decisions before revision.

Bring to this stage

  • source-map
  • input-material
  • indicator-review
  • burden-and-decisions
  • reference-sheets
  • me-plan

Also bring if that branch was selected

  • focused-measurement-artifact

Record unselected branches as not applicable.

Keep this artifact

  • review-issues

Check before moving on

  • Reconcile IDs, definitions, denominators, sources, frequencies, roles, uses and burden.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: me-plan-review. Full source text, revision and digest are included in the copied instructions.

37,591 characters

Inspect exact instructions: Copy Check the complete measurement set Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Use a branch only when it fits

Optional branch · focused-measurement

Draft one measurement artifact

Use when: Only one artifact needs drafting or updating.

Choose only the relevant focused prompt. Carry the same source map, definitions and feasibility decisions into its output.

Bring to this stage

  • source-map
  • input-material

Keep this artifact

  • focused-measurement-artifact

Check before moving on

  • A focused draft still needs cross-artifact coherence checks.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: create-smart-indicators; prompt: create-indicator-reference-sheet; prompt: create-mel-plan. Full source text, revision and digest are included in the copied instructions.

23,603 characters

Inspect exact instructions: Copy Draft one measurement artifact Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Revise or resume without losing decisions

Revise after the task review

Each review issue needs a stable ID, artifact/location, source or method basis, consequence and actionable correction. Record accept, reject or amend with a reason and decision/source ID. Preserve the original v1, create v2 and retain unresolved issues. Proposed changes are not accepted decisions. Rerun the affected source-method checks and cross-artifact checks; preserve both changed and unchanged commitments.

Use this combined copy after the task review. To revise an earlier artifact, choose Revise with decisions and copy its own stage instructions above. Bring the original, applicable review and issue dispositions. Later artifacts that do not exist remain unperformed.

Bring back

  • source-map
  • named-draft-to-revise
  • corresponding-issue-register
  • issue-dispositions

Already-produced context, when available

  • indicator-review
  • burden-and-decisions
  • reference-sheets
  • me-plan
  • focused-measurement-artifact

Bring only context that was actually produced and branch artifacts from selected branches. Retain their names and versions during revision.

Version names for supplied revision targets

These are naming choices, not a requirement to create every artifact. Revise only the named draft you supplied.

  • indicator-review to indicator-review-v2
  • burden-and-decisions to burden-and-decisions-v2
  • reference-sheets to reference-sheets-v2
  • me-plan to me-plan-v2
  • review-issues to review-issues-v2
  • focused-measurement-artifact to focused-measurement-artifact-v2

Preserve

  • Original supplied sources and every original named draft
  • Stable question, indicator, finding and issue IDs

Produce

  • versioned-selected-drafts
  • change-record
  • unresolved-decisions
42,401 characters

Inspect exact instructions: Copy Revision and Disposition Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Continue in a new chat

Bring the latest named artifact, source inputs, issue list, decision dispositions and the method text for the next stage. State what passed, failed or remains unperformed. The assistant must inspect those materials and confirm the next step before continuing.

2,151 characters

Inspect exact instructions: Copy Resume Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Finish with a usable output

  • Return usable named deliverables, source/decision notes, limitations, unresolved issues and the change record. Check repeated IDs, definitions, periods, denominators, citations and arithmetic across artifacts. A documented unsuitable-input decision or an unexecuted specification can be the honest usable outcome.
  • Distinguish unperformed, blocked, proposed and checked work. Never claim fieldwork, computation, pilot completion, approval, causal identification, file generation or host capability without actual evidence.
  • Use the review and dispositions to produce the final revised set. Retain unresolved decisions and proposed commitments visibly.

Keep the source inputs, named artifacts, checks, decisions and final version together. A draft, an accepted decision, a checked calculation and a created file are separate facts. Mark any unperformed check clearly.

A fictional transition

Fictional case: monthly totals are possible but household follow-up access is unconfirmed. Retain the obligation, show the gap and propose feasible options without assuming access.

This small illustration is fictional. It is not an observed assistant result or real project evidence.

Source resources and optional assets

The task connects existing methods and keeps their criteria. Copied stage instructions contain the resolved method text and its source identity. Adaptations are labeled separately. Resources are in English unless a resource explicitly says otherwise. Earlier install packages may contain different bytes from the current portable methods. Source projection, installation, host checks and publication are separate facts.

Skill · English

Indicator Quality Review

Assess definitions, SMART and CREAM qualities, disaggregation and measurability.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 6d1506afd37ee281c5e9ae01a30c8884de66b77785d7988fa72af7e5da2b8fab
Source-file SHA-256: ac73c2304bf69deaa6b38a78fda5a9487876651ce7246ac29984daee0c53188b
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

Measurement Feasibility and Burden

Calculate collection workload and compare practical simplification options.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 57c510726a952905d72f0466a1e1207d9bba69574b93b3fa71e1bb3416a3f533
Source-file SHA-256: 57c510726a952905d72f0466a1e1207d9bba69574b93b3fa71e1bb3416a3f533
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

Indicator Reference Sheets

Define each indicator so people can collect and interpret it consistently.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: cbab0e1336e89df9c37ffc31a75ebc9115bf2f936296eb1e23b78b0f953f34cb
Source-file SHA-256: 19bea3a042a1e67b55681679898b8095c156977c99aff2fb89a1906269a8c0e1
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

M&E Plan Draft and Coherence

Build a practical plan and check that definitions, responsibilities and use agree.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: c9ca0a9cf189b81933355746d7836347d92fae77e7015b61b5be2d154f7f2abd
Source-file SHA-256: e3b00bcbae62361e54c1776b08fd586b066ddb1e228f3eba989a1b45a62ccd13
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Skill · English

M&E Plan Review

Identify gaps and inconsistencies in a measurement and learning plan.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: bae5113c4709b9a7f89ba8d8f21118bb32c15356ae98ecd89ecdf24e6406ad16
Source-file SHA-256: 9f2cf771ac5966683d116b878702927e483b26dd1d1c74cb2843781b64742c20
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Prompt · English

Create SMART Indicators

Generate specific, measurable, achievable, relevant, and time-bound indicators from your program objectives.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 083e87115c012ea6e545cd362d22fbf2aeb66113fba6e64eb1ecaa3e96f58157

2,536 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Create an Indicator Reference Sheet

Document how each indicator is defined, measured, disaggregated and reported, with baseline and target status.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: fb704060757441c2f53115b78f83cfdc5cc65fe5bd99bac19fe4f9e4960a1910

1,829 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Prompt · English

Create a MEL Plan

Develop a monitoring, evaluation, and learning plan with indicators, data collection methods, timelines, and responsibilities.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 6a235628ee739d7e12f0ac215d4e2ab186bbdf8393bd912cfb9589ca2a1d85fd

1,741 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Workflow · English

Feasible Measurement

Move from indicator review to reference sheets and a feasible M&E plan.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: eb3b618c1cf2ee378bb51e6c1d317e6e37b2ad92a5d3c70a060325d7583ae4f0
Source-file SHA-256: cc6b6a625418da7112b3f0cc2f073c0c739d78896dd99e7ab618cf976ee1ef7f
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Download · English · docx

Indicator reference sheet guided template

Existing guided template. Adapt it to the actual task and requirements.

Source identity

Revision: existing-reference-download
File SHA-256: 13e9cef17b688831146050d7227aa599e8330bc1bfc526bd4a2116a8832dc0cb

Download · English · pdf

Indicator reference sheet worked example

Fictional worked material. Adapt its structure; do not treat example figures as program evidence.

Fictional example or template

Source identity

Revision: existing-reference-download
File SHA-256: ecd7dc35f091492d7da0b8aef569d7e2954096cdf60dc74767e1dfc5dbb54a7c

Download · English · docx

Mel plans guided template

Existing guided template. Adapt it to the actual task and requirements.

Source identity

Revision: existing-reference-download
File SHA-256: 9ffe9328eb7bc2299d26a31dd34e56b5ede3107de6247339cabaaf84421744c4

Download · English · pdf

Mel plans worked example

Fictional worked material. Adapt its structure; do not treat example figures as program evidence.

Fictional example or template

Source identity

Revision: existing-reference-download
File SHA-256: d81fe2da128fcc6cc3e235bdd6fa719f1b9aef377aa3df039046c6974def56d1

Download · English · xlsx

Indicator guided template

Existing guided template. Adapt it to the actual task and requirements.

Source identity

Revision: existing-reference-download
File SHA-256: 854d1a900e6f34992358a3a94342e17f5b51529f0db96833ab1bbf96778392dc

Browse all task kits and stand-alone resources