Review an Inception Workplan

Review actual inception workplan with TOR/deliverables, methods, team availability/effort, required reviews and known seasonal/access constraints. Ask for missing contents before deliverability judgments.

Check visible inception, tool development, collection, transcription/analysis and reporting blocks with dates; allow justified overlap/iteration when dependencies/resources are clear. Assess actual required milestones, outputs, owners and verifiable review/acceptance criteria, not a mandatory workshop added to fill a chart.

Trace what blocks what, including tool testing, needed reviews and staff readiness before field launch; training may include a pilot. Allow realistic context-specific review/approval/access delays and contingencies. Ethics review is conditional on the actual activity/rules; no invented stage or universal buffer percentage. Check person-by-phase loading/double-booking and compressed work against actual methods and access/seasons.

Return short assessment, located phase/milestone/dependency/buffer/resources/deliverability table and must/should revisions. Rate Meets/Needs Revision/Not Assessable/reasoned Not Applicable, numeric anchors only if supplied. Missing evidence limits review, not proof work failed; do not invent dates/staff or completed approval. Any readiness recommendation remains conditional on unresolved checks and responsible owner review.

Choose This Prompt When
Use this for an inception workplan's timing and dependencies. Choose Review an Inception Report for the full design, or Review a ToR Budget for resource-cost alignment.
Loading saved answers...

Worked Example

Illustration only. The setting and figures are invented to show the pattern.

Scenario: The inception report for a midterm evaluation of a regional livelihoods program is nearly done, and the external team writing it has a workplan to defend. The workplan is a one-page Gantt chart, and the client wants to know if it can be delivered.

What You Give the AI: The workplan table, the ToR deliverable dates, the proposed methods (a household survey and key informant interviews), a staff availability note and the rainy season dates for the districts.

What the AI Might Return: A table with one row per phase. One row reads: phase 'Data collection', dates 'weeks 7 to 10', depends on 'survey tool tested and enumerators trained', resources 'two team members booked on another task in week 9', judgment 'Needs Revision'. A must-fix list follows, such as moving tool testing ahead of training, and a conditional note that the plan cannot be called deliverable until staff availability is confirmed.

When to Choose This Prompt

  • You have the workplan from an inception report and want its timing, sequence and staffing checked before the client reads it.
  • A reviewer said the schedule looks tight and you want to see which dependencies cause that.
  • You commissioned the evaluation and want a structured read of a workplan you received.

When Not to Choose It

Checking the Output

  • Put the Gantt chart beside the review table. Every phase the AI rates should be a block you can find on the chart.
  • Dependencies named in the review should match your own sequence. If it says tool testing comes before training, confirm your chart shows that order.
  • Any claim that a person is double-booked should trace to the availability note you pasted.
  • Seasonal and access delays should come from the constraints you listed. Strike any the AI added from general knowledge.
  • A suggested contingency should point to a named risk. A flat percentage with no source is the AI's guess.
  • Items marked Not Assessable should be the ones where you gave no evidence, such as ethics rules.

Common Problems and Fixes

  • The AI adds an ethics approval stage or a workshop your evaluation does not need. Fix: Tell it which reviews apply, and have it drop the rest.
  • It calls staff overloaded although you gave no effort figures. Fix: Mark staffing Not Assessable and list the figures it would need.
  • Missing dates are read as a failure of planning. Fix: Separate 'not shown in the supplied workplan' from 'not planned'.
  • A universal buffer is recommended for every phase. Fix: Tie contingency to the specific delays in your constraints.

Adapting It to Your Context

  • Fieldwork across seasons: Paste the access calendar and ask for each phase to be checked against its window.
  • Small evaluation team: List each person with time per phase and ask for a person-by-phase loading check.
  • Client with fixed deliverable dates: Give the dates and ask the AI to work backward from them to the latest start for each phase.

Next Step