M&E StudioTools

Create from my documents: Draft an M&E Scope of Work

Create from my documents: Draft an M&E Scope of Work: Your prompt

You are a senior MEAL specialist with experience commissioning evaluations and hiring M&E consultants. Your task is to draft a comprehensive Scope of Work (SOW) for "assignment" (from the material, if given).

Assignment Context:

  • Organization: "organization" (from the material, if given)
  • Program name: "program name" (from the material, if given)
  • Donor: "donor" (from the material, if given)
  • Assignment type: "type" (from the material, if given)
  • Program location: "location" (from the material, if given)
  • Program duration: "duration" (from the material, if given)
  • Program budget: "budget" (from the material, if given)
  • Estimated evaluation budget: "eval budget" (from the material, if given)
  • Target beneficiaries: "beneficiaries" (from the material, if given)

Draft the following SOW sections:

1. Background and Context

  • Organizational overview (2-3 sentences)
  • Program description (objectives, key interventions, target population, geographic scope)
  • Theory of change summary
  • Reason for the evaluation and how findings will be used

2. Evaluation Purpose and Objectives

  • Primary purpose (accountability, learning, or both)
  • 3-5 specific evaluation objectives
  • Primary intended users and uses

3. Evaluation Questions Provide 8-10 evaluation questions organized by OECD-DAC criteria. Include at least one question addressing gender equality and social inclusion.

4. Scope and Methodology

  • Geographic and temporal scope
  • Expected methodological approach (mixed methods)
  • Minimum requirements: document review, key informant interviews, focus group discussions, quantitative data analysis
  • Gender-responsive and conflict-sensitive evaluation requirements
  • Ethical standards and safeguarding requirements
  • Note: "The detailed methodology will be proposed by the consultant/firm in the inception report and approved by the Evaluation Reference Group."

5. Deliverables and Timeline

DeliverableDescriptionDue DatePayment Milestone

Include at minimum:

  • Inception report (including evaluation matrix, detailed methodology, data collection tools, workplan)
  • Data collection instruments (drafts for review)
  • Preliminary findings presentation (PowerPoint)
  • Draft evaluation report
  • Final evaluation report (incorporating comments)
  • Evaluation brief (4-page summary)
  • Clean datasets and codebook
  • Management response facilitation workshop

Specify review periods (typically 10 working days for draft review) and maximum number of revision rounds (typically 2).

6. Evaluation Team Requirements

  • Team Leader qualifications (education, years of experience, technical expertise, language requirements)
  • Team member qualifications
  • Required and desirable competencies
  • Conflict of interest declaration requirement

7. Management and Governance

  • Evaluation Reference Group composition and role
  • Reporting lines
  • Quality assurance process
  • Communication protocols

8. Budget and Payment Schedule

  • Budget ceiling or range
  • Payment milestone structure (typically: 20% at inception, 30% at preliminary findings, 50% at final report)
  • What the budget should cover (personnel, travel, translation, data collection costs)
  • What the commissioning organization will provide (office space, documents, introductions)

9. Proposal Submission Requirements

  • Technical proposal contents (understanding of TOR, methodology, team composition, workplan, past experience)
  • Financial proposal format
  • Page limits
  • Submission deadline and method
  • Contact for questions

10. Evaluation Criteria Provide the technical scoring criteria:

CriterionWeightDescription

Typical weighting: Technical understanding (20%), Methodology (30%), Team qualifications (25%), Relevant experience (15%), Value for money (10%)

Align with UNEG Norms and Standards for Evaluation and the commissioning organization's evaluation policy.

Where the material is silent, write "Not in the material" rather than guessing.

Source material: Attached, or pasted below. Base everything above on it and do not invent details that are not in it.

Prompt · Create a Document · about 565 words

Turn a proposal or notes into something new

You'll Need

Your documents

You Get Back

A first draft built from your documents

Parts