Create an Evaluability Assessment
Assess whether a proposed evaluation can credibly answer its intended questions. Ask for the program design, decisions, existing data, evaluation users, and constraints before assigning a readiness rating.
Assess four areas with an evidence trail. (1) Program design: problem, results logic, assumptions, implementation variation, and clarity of the intervention, with source references. (2) Evidence: inventory actual indicators and records, baselines where needed, quality, coverage, access, and whether data answer each proposed question. (3) Use and stakeholders: identify intended users, decision timing, governance, and perspectives missing from the supplied record; do not claim consultations occurred. (4) Feasibility: methods suited to the specific questions, time, skills, resources, ethics, political risks, and field access. A comparison group and statistical power matter only for a causal design that needs them. Use a question-by-evidence matrix and a transparent readiness judgment such as ready, conditionally ready, or not yet ready, with reasons and prerequisites; leave the judgment provisional if key documents are missing. Give prioritized actions, owners to confirm, and a realistic reassessment point. Describe only EA methods actually performed; list interviews, site visits, or audits as proposed next steps, not completed checks. Do not fabricate a 1 to 5 score, a count of reviewed indicators, or a 4 to 8 week process.
- Choose This Prompt When
- Choose this before committing to an evaluation design; choose evaluation design review after a design document exists.
On this page
Worked Example
Illustration only. The setting and figures are invented to show the pattern.
Scenario: A midterm review is planned for a youth skills program in four regions, 14 months into a 36-month cycle. The board asked if an impact evaluation is realistic.
What You Give the AI: The theory of change, twelve indicators with the records behind them, the draft evaluation questions, the intended users and decision date, the evaluation budget, and a note that no comparison group data exist.
What the AI Might Return: A question-by-evidence matrix. One row reads: question 'Did trainees' incomes rise?', data available 'income recorded at enrollment only', gap 'no follow-up measure', readiness 'not yet ready'. The overall judgment is conditionally ready for a process-focused midterm review, with two prerequisites and a reassessment point after the next monitoring round.
When to Choose This Prompt
- You are deciding whether to commission an evaluation and need to know if it can answer its questions.
- Questions exist, but you doubt that the data, program logic or timing allow credible answers.
- You want prerequisites listed in priority order, with a date to look again.
When Not to Choose It
- A design document exists and needs testing. Review My Evaluation Design
- You have decided to go ahead and need terms of reference to commission. Draft Evaluation Terms of Reference
- A ToR is drafted and you want to know if it is ready to issue. Review ToR Readiness
- You need help picking an evaluation approach. Suggest the Right Methodology
Checking the Output
- Compare each evaluation question in the matrix with your data inventory. A question marked answerable needs a named source.
- Each of the four areas (design, evidence, use, feasibility) should cite a document you supplied.
- The readiness label should follow from the reasons given, and stay provisional if key documents were missing.
- Owners for prerequisites should be roles you can confirm. Names the AI made up need to read as to be confirmed.
- Interviews, site visits or audits should appear as proposed next steps and never as checks already done.
- Talk of a comparison group or statistical power should appear only if the evaluation you describe is causal.
Common Problems and Fixes
- A score out of five or a count of reviewed indicators appears. Fix: Delete it. The judgment is qualitative, and the count should be yours.
- The AI rates readiness with the program design missing. Fix: Ask it to list the documents it needs first and hold the judgment until you provide them.
- It pushes toward an impact evaluation by default. Fix: State the evaluation purpose and the decision it serves, so feasibility is tested against that.
- A duration for the assessment process is invented. Fix: Remove it and replace it with your own calendar.
Adapting It to Your Context
- Program early in its cycle: Missing baselines can still be collected, so early in a cycle the prerequisites list should schedule them.
- Sparse records: Describe what each record holds and its coverage, and expect a conditional result with data prerequisites.
- Politically sensitive evaluation: Add the political risks you know of and ask for them to be weighed in the feasibility area.