Plan or review operational data quality

An appropriate DQA plan or evidence-based review with unverified checks and actual corrective decisions visible.

Bring these inputs

Input types: DQA plan; DQA report; Monitoring records. Use source documents and evidence you are authorized to share. A missing input is a question or a stop, never permission to invent facts.

Minimum inputs

  • Identify a prospective plan, completed report or operational dataset
  • Actual definitions, data flow, requirements and verification evidence

Useful if available

  • Registers, verification samples, check records and thresholds
  • Actual responsibilities and corrective commitments

Decisions you must make

  • Select plan, report review or data diagnosis before applying criteria.
  • Confirm thresholds, scope and commitments from actual requirements.

Start in Claude or ChatGPT

Choose how to work, inspect the instructions, then copy them to your own assistant. These controls stay in page memory and reset when you leave. This page does not accept or save your documents, run AI or send these choices.

Task instructions are available in English and Spanish. Each source method keeps its declared language and provenance; methods without an accepted Spanish edition are labeled English and supplied unchanged.

31,281 characters

Inspect exact instructions: Copy Task Starter

This is the complete text used by this copy control. No documents or settings are sent by this page.

Paste the starter first. It includes intake, the ordered task plan and the exact method for your selected branch, or the default method for your working mode. It asks for the required inputs and decisions before proceeding. Copy each later stage when its required artifacts are ready. Keep the artifacts in your own files; a new chat cannot recover them from this page.

Your chosen assistant processes anything you provide under its own account settings, policies, capabilities and limits. Follow your organization's rules and remove names or sensitive details before sharing material. Check its actual file-reading and output abilities; account access or a copied method does not prove a successful run.

See Claude setup and limits

Work through the stages

Each stage names the artifact that the next stage needs. Keep its source references, assumptions, unresolved issues and version label together. Do not continue past a substantive stop or silently treat a draft as accepted.

Stage · dqa-planning

Plan data-quality verification

For a prospective plan define dimensions, verification, sampling, timing, escalation and action recording from actual risks. Leave prospective findings blank. For an existing report preserve it and move to review.

Bring to this stage

  • source-map
  • input-material

Keep this artifact

  • dqa-plan-or-supplied-report

Check before moving on

  • Do not impose universal 5 percent tolerance, expiry or sample size.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: skill: data-quality-planning; prompt: create-data-quality-audit. Full source text, revision and digest are included in the copied instructions.

31,283 characters

Inspect exact instructions: Copy Plan data-quality verification Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Stage · dqa-review

Apply the operational check

Apply the rubric only to its applicable object and the skill to readable supplied evidence. Separate plan adequacy from completed verification findings.

Bring to this stage

  • source-map
  • input-material
  • dqa-plan-or-supplied-report

Also bring if that branch was selected

  • data-diagnosis

Record unselected branches as not applicable.

Keep this artifact

  • review-issues

Check before moving on

  • Absent registers mean unverified, not a confirmed integrity failure.
  • Separate missing evidence, design gaps and verified errors.
  • Owners and dates remain proposed until confirmed.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: rubric: operational-data-quality; skill: data-quality-review. Full source text, revision and digest are included in the copied instructions.

35,754 characters

Inspect exact instructions: Copy Apply the operational check Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Use a branch only when it fits

Optional branch · data-diagnosis

Review supplied data directly

Use when: Actual operational data is supplied for diagnosis.

This separate prompt has no automatic rubric mapping. Do not silently substitute the operational rubric.

Bring to this stage

  • source-map
  • input-material

Keep this artifact

  • data-diagnosis

Check before moving on

  • Record readable scope, actual checks and unperformed checks.

If inputs are missing or conflict: List blocking gaps and consequences. Complete only supported parts, label provisional work and do not invent evidence. For unsuitable input explain the fit problem and offer a supported route.

Your decision is required. Resolve conflicting governing sources and consequential assumptions before treating them as agreed.

Methods used: prompt: review-data-quality. Full source text, revision and digest are included in the copied instructions.

17,810 characters

Inspect exact instructions: Copy Review supplied data directly Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Revise or resume without losing decisions

Revise after the task review

Each review issue needs a stable ID, artifact/location, source or method basis, consequence and actionable correction. Record accept, reject or amend with a reason and decision/source ID. Preserve the original v1, create v2 and retain unresolved issues. Proposed changes are not accepted decisions. Rerun the affected source-method checks and cross-artifact checks; preserve both changed and unchanged commitments.

Use this combined copy after the task review. To revise an earlier artifact, choose Revise with decisions and copy its own stage instructions above. Bring the original, applicable review and issue dispositions. Later artifacts that do not exist remain unperformed.

Bring back

  • source-map
  • named-draft-to-revise
  • corresponding-issue-register
  • issue-dispositions

Already-produced context, when available

  • dqa-plan-or-supplied-report
  • data-diagnosis

Bring only context that was actually produced and branch artifacts from selected branches. Retain their names and versions during revision.

Version names for supplied revision targets

These are naming choices, not a requirement to create every artifact. Revise only the named draft you supplied.

  • dqa-plan-or-supplied-report to dqa-plan-or-supplied-report-v2
  • review-issues to review-issues-v2
  • data-diagnosis to data-diagnosis-v2

Preserve

  • Original supplied sources and every original named draft
  • Stable question, indicator, finding and issue IDs

Produce

  • versioned-selected-drafts
  • change-record
  • unresolved-decisions
38,047 characters

Inspect exact instructions: Copy Revision and Disposition Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Continue in a new chat

Bring the latest named artifact, source inputs, issue list, decision dispositions and the method text for the next stage. State what passed, failed or remains unperformed. The assistant must inspect those materials and confirm the next step before continuing.

2,155 characters

Inspect exact instructions: Copy Resume Instructions

This is the complete text used by this copy control. No documents or settings are sent by this page.

Finish with a usable output

  • Return usable named deliverables, source/decision notes, limitations, unresolved issues and the change record. Check repeated IDs, definitions, periods, denominators, citations and arithmetic across artifacts. A documented unsuitable-input decision or an unexecuted specification can be the honest usable outcome.
  • Distinguish unperformed, blocked, proposed and checked work. Never claim fieldwork, computation, pilot completion, approval, causal identification, file generation or host capability without actual evidence.
  • Use the review and dispositions to produce the final revised set. Retain unresolved decisions and proposed commitments visibly.

Keep the source inputs, named artifacts, checks, decisions and final version together. A draft, an accepted decision, a checked calculation and a created file are separate facts. Mark any unperformed check clearly.

A fictional transition

Fictional case: a report claims 97 percent accuracy but registers are absent. Locate the unsupported claim and missing evidence; do not fabricate an error rate.

This small illustration is fictional. It is not an observed assistant result or real project evidence.

Source resources and optional assets

The task connects existing methods and keeps their criteria. Copied stage instructions contain the resolved method text and its source identity. Adaptations are labeled separately. Resources are in English unless a resource explicitly says otherwise. Earlier install packages may contain different bytes from the current portable methods. Source projection, installation, host checks and publication are separate facts.

Skill · English

Data Quality Assessment Plan

Plan a risk-based data quality assessment with proposed checks, owners and timing.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 8be3fc2404e144ead4349e998f46dddf11ea38d3643dd1846b18d30b63fa6cb3
Source-file SHA-256: 9a4087c05f0f8e8cf31fb941cca86af00f9ab8305d3fc94588db08e16bf6b50e
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Prompt · English

Create a Data Quality Audit Protocol

Create a data quality audit protocol with verification procedures, sampling strategy, scoring rubric, and corrective action framework for assessing M&E data reliability.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 1a7f1d48f69ca6680562a626ddb2b103b5d25fb1049c53819f53ecc295cf2708

2,842 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Rubric · English

Operational Data Quality Assessment

Draft, review, and improve a purpose-specific DQA plan or assessment while separating verified findings, evidence gaps, and operational limits.

Source identity

Revision: 2026-11-03
Copied-text SHA-256: 1c70fc5bcbb4f89a5416081bc06efce6be2f374bb9be4fffee77c92cb6bc37a9

Skill · English

Data Quality Review

Review data quality evidence, verification and proposed improvement actions.

Source identity

Revision: 303703c442dfbadbcdcec78cb6244d6ca2e81032
Copied-text SHA-256: 3962b94dd98531b4a35b20b9cefeeaa55e22872fe0c0cbbd1ec0b4c9a456c646
Source-file SHA-256: 3962b94dd98531b4a35b20b9cefeeaa55e22872fe0c0cbbd1ec0b4c9a456c646
Text transform: UTF-8 text with CRLF or CR line endings normalized to LF; served asset retains source bytes.

Prompt · English

Review Data Quality

Review a dataset or data collection process for quality issues across five dimensions: completeness, accuracy, consistency, timeliness, and validity.

Source identity

Revision: 6.1/2026-03-26T00:00:00.000000
Copied-text SHA-256: 66e83f9d443df860f4426998af9ed712a790d74b75a1f31a486cfb1746a4d9ab

3,006 characters

Inspect exact instructions: Copy Original Source Prompt

This is the complete text used by this copy control. No documents or settings are sent by this page.

Browse all task kits and stand-alone resources