Before You Assess
Completeness of the actual mechanism, without adding irrelevant levels to fill a template.
Materials: Components/scope, pathway, intended changes, mechanisms, relevant branches, and other actors.
Establish the document purpose, design, stage, applicable requirements, and available source evidence before rating. Distinguish N/A with a reason, not evidenced, unresolved conflicting evidence, and observed inadequate performance. Missing records do not prove an activity did not occur. Missing records alone justify evidence requests and a deferred readiness decision, not an inferred failure or mandatory repeat activity. Do not invent documentary, signature or approval requirements. Cite document locations for every finding. Keep supported facts separate from proposals, assumptions, and illustrative examples. Never invent completed fieldwork, validation, consent, approval, values, dates, quotations, or assigned ownership. Label unconfirmed owners and proposed revisions for confirmation. Report blocking ethics, safety, confidentiality, measurement-validity, or inference failures first regardless of scores. Give a total and band only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict; otherwise show the dimension profile, coverage, and evidence requests without a total, band, or rescaled equivalent. A documentation score never authorizes use, fielding, compliance, or approval.
Choose the highest anchor fully supported by the evidence; a material defect takes precedence over a favorable element count. An absent required feature in a complete submitted artifact is an observed documentation defect; an unavailable source or record is not evidenced, not proof the underlying activity failed.
Scoring Criteria
The pathway connects actual activities/outputs to intended changes within the scope. Every step needed to explain the mechanism is represented or a compressed transition is justified. A short pathway can be complete; fixed knowledge, behavior, system, and population stages are not universal.
The pathway is complete for its purpose; one noncritical transition has limited detail without hiding a needed mechanism.
The broad chain is recognizable but a necessary transition is missing or unjustifiably compressed.
Material causal steps are missing, leaving unsupported leaps from delivery to change.
No usable connection links what the program does to the change it claims to influence.
Intermediate steps are explicit wherever the actual mechanism needs them. Direct/short pathways are justified where appropriate; behavior change is not required for every institutional, service, or policy mechanism.
Needed intermediate steps are mostly explicit; one minor connection is compressed but understandable.
A necessary intermediate step is unclear, weakening explanation of intended change.
Several necessary mechanisms are omitted or assumed, materially weakening the claim.
No usable intermediate explanation exists where one is required. A justified direct pathway is not inadequate.
Each step credibly causes the next, with the mechanism stated. The chain reads as a series of if-then statements that a reader unfamiliar with the program could follow. No leaps requiring unstated theory.
Mechanism stated for no fewer than 80 percent of steps. The remainder are credible but the mechanism is implied rather than stated.
Mechanism stated for half or more steps. The remainder rely on common-sense connections that a reader could infer but which are not made explicit.
Mechanism stated for fewer than half of steps. Several transitions require unstated theory or contain implausible leaps.
No mechanisms stated. Pathway reads as a list of desired states with no causal explanation.
Where the program has multiple components, audiences, or contexts that operate through different mechanisms, alternative or branching pathways are shown. Convergence points (where pathways meet) are named. Single-pathway ToCs explicitly justify why one pathway suffices.
Major branching shown where relevant. One or two minor branches may be collapsed but the alternative pathway logic is recognizable. Convergence points named.
Branching referenced but not fully drawn out. The ToC acknowledges multiple components but the pathways are merged into a single line of logic, OR the ToC is single-pathway without justification despite obvious component differences.
No branching shown despite multiple distinct components or audiences. The ToC forces a single linear pathway onto a program that operates through several mechanisms.
No consideration of branching or alternative pathways. The ToC is a single linear chain with no acknowledgment of complexity.
The ToC explicitly states what the program does and does not cause. Where the program is one of several actors, contribution is acknowledged rather than attribution claimed. External actors and their contributions are named. The boundary between program-driven change and context-driven change is clear.
Scope reasonably bounded. Contribution acknowledged at major attribution points. One or two transitions may overstate program agency but the overall boundary is recognizable.
Scope implied but not explicitly stated. Contribution and attribution conflated at half or more transitions. External actors named in passing but their role in the pathway is not specified.
Over-ambitious scope at multiple points. Program claims full credit for changes involving many actors. External actors not named.
No scope boundary. ToC claims attribution for population-level change with no acknowledgment of other actors or contextual factors.
Score Interpretation
Start with blockers, the dimension profile, located findings, and priority revisions. These provisional descriptive bands apply only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict. Do not rescale after N/A or missing evidence. A band does not grant authorization or establish practitioner calibration.
| Total Score | Band | Next Step |
|---|---|---|
| 22-25 | Strong | Strong documentation profile only. Resolve blocking issues and obtain the applicable human review; this score does not authorize use. |
| 17-21 | Adequate | Prioritize source-linked revisions in the weakest dimensions. Request missing records before proposing additional activity; confirm the need for any new work from evidence. |
| 11-16 | Needs Revision | Use located findings as a revision brief. Distinguish reporting gaps from demonstrated design or implementation failures and label proposed work for confirmation. |
| 5-10 | Substantial Revision | Rework the evidence-backed weaknesses with accountable review. A low documentation profile alone does not establish that the underlying activity failed or must be repeated. |