Governing evidence and applicability rules (take precedence over aggregate bands):
- Establish the document purpose, design, stage and available evidence before rating.
- A fit-for-purpose single-method design can earn the highest applicable rating; do not require complexity, mixed methods or two sources for every finding.
- Distinguish applicable, not applicable with reason, not evidenced, and observed inadequate.
- Report applicable coverage and the raw denominator.
- If any dimension is N/A or not evidenced, report the profile and gaps without a 25-point band or an unvalidated rescaled equivalent.
- Never interpret missing documentation as proof no activity occurred.
- Use source-linked historical facts only; keep proposed work and illustrative examples separate.
- Preserve unresolved source conflicts.
- Do not invent baseline values, quotations, fieldwork, pilots, validation, consent or approvals to improve a score.
- A serious consent, confidentiality, safeguarding, measurement-validity or unsupported-inference failure is a blocking issue regardless of the total, including 22/25.
- High document-quality scores do not establish legal compliance, instrument readiness, field authorization or donor approval.
- Accountable human review against the applicable protocol is separate.
- A well-documented failed pilot may score 25/25 for documentation while remaining not ready for fielding.
Scoring Criteria
All 4 elements: Primary stakeholders identified (program staff, intended beneficiaries, implementing partners), secondary stakeholders identified (donors, government, other actors in the operating environment), program-internal and external stakeholders distinguished, and identification is grounded in a stakeholder mapping exercise or analysis rather than a generic list.
Three of four elements adequately specified; the remaining element incomplete: Primary and secondary stakeholders identified; mapping rationale or boundary distinction partial.
Two of four elements adequately specified; the others incomplete. Stakeholders listed but mapping rationale absent.
Stakeholders mentioned as a generic list (e.g., "we will engage stakeholders") without categorization.
No stakeholder identification, OR identification limited to the commissioning party.
All 4 elements: Engagement mode (consult, inform, collaborate, co-create, or equivalent ladder rung) specified per stakeholder or stakeholder group, rationale ties the mode to the stakeholder's role and the evaluation's purpose, modes differ across stakeholders (not uniform "consult" for everyone), and modes are realistic given timeline and budget.
Three of four elements adequately specified; the remaining element incomplete: Mode specified per stakeholder with rationale; mode differentiation or realism partial.
Two of four elements adequately specified; the others incomplete. Mode specified for some stakeholders. Rationale generic.
Mode named uniformly (e.g., "stakeholders will be consulted") without per-stakeholder specification.
No engagement mode specified.
All 4 elements: Each engagement point mapped to a specific phase or week in the evaluation timeline, frequency stated where engagement is recurring (e.g., weekly check-ins, monthly steering group), timing accounts for stakeholder availability (e.g., harvest season, ministry budget cycle), and lead times for invitations and materials are specified.
Three of four elements adequately specified; the remaining element incomplete: Engagement timing mapped; frequency or lead times partial.
Two of four elements adequately specified; the others incomplete. Some engagement points have timing; others are vague.
Timing referenced as "throughout the evaluation" without anchors. No frequency or lead times.
No timing or frequency specified.
All 4 elements: Channels for stakeholders to push back on findings are specified (e.g., written comment period, validation workshop, structured response forms), draft outputs will be shared in advance with a stated review window, dissent or minority views will be documented and addressed in the final report, and a mechanism for raising concerns mid-evaluation is named.
Three of four elements adequately specified; the remaining element incomplete: Pushback channels and draft sharing specified; dissent handling or mid-evaluation channel partial.
Two of four elements adequately specified; the others incomplete. Validation referenced but channels generic.
Validation referenced as a checkbox without channel specification.
No two-way feedback mechanism. Engagement is one-way (extract data, deliver findings).
All 4 elements: What stakeholders receive after engagement specified (draft report, executive summary, final report, briefing), format adapted to stakeholder needs (e.g., short brief for beneficiaries, full report for donor), timing of post-evaluation communication stated, and follow-up commitments named (e.g., management response timeline).
Three of four elements adequately specified; the remaining element incomplete: Outputs and timing specified; format adaptation or follow-up partial.
Two of four elements adequately specified; the others incomplete. Final report shared but format not adapted. Follow-up vague.
Only the commissioning party receives outputs. No format adaptation.
No accountability loops. Engagement ends at data collection.
Score Interpretation
Report blockers, the dimension profile, and evidence coverage first. Use these aggregate bands only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict. Otherwise give no total, band, or rescaled equivalent. High documentation quality does not establish readiness, legal compliance, or approval.
| Total (out of 25) | Band | Next Step |
|---|---|---|
| 22-25 | Strong | Strong documentation profile only. Resolve blocking issues and obtain the applicable human review; this score does not authorize use. |
| 17-21 | Adequate | Prioritize source-linked revisions in the weakest dimensions. Request missing records before proposing additional activity; confirm the need for any new work from evidence. |
| 11-16 | Needs Revision | Use located findings as a revision brief. Distinguish reporting gaps from demonstrated design or implementation failures and label proposed work for confirmation. |
| 5-10 | Substantial Revision | Rework the evidence-backed weaknesses with accountable review. A low documentation profile alone does not establish that the underlying activity failed or must be repeated. |