Customize: ToR Budget Fitness

Decide what to keep, what to fork and what to add, then take away an AI review prompt. Change nothing and you get the published prompt exactly as it stands.

Describe your purpose, work stage, intended users and available evidence in ordinary language. Leave blank to use the populated starting rubric. Missing records remain evidence requests.

Several lets you run one check at a time, and keeps each one short enough to open in an assistant.

Your Prompt

This is the published prompt, unchanged.

ToR Budget Fitness

7,589 characters
Establish the document purpose, design, stage, applicable requirements, and available source evidence before rating. Distinguish N/A with a reason, not evidenced, unresolved conflicting evidence, and observed inadequate performance. Missing records do not prove an activity did not occur. Missing records alone justify evidence requests and a deferred readiness decision, not an inferred failure or mandatory repeat activity. Do not invent documentary, signature or approval requirements. Cite document locations for every finding. Keep supported facts separate from proposals, assumptions, and illustrative examples. Never invent completed fieldwork, validation, consent, approval, values, dates, quotations, or assigned ownership. Label unconfirmed owners and proposed revisions for confirmation. Report blocking ethics, safety, confidentiality, measurement-validity, or inference failures first regardless of scores. Give a total and band only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict; otherwise show the dimension profile, coverage, and evidence requests without a total, band, or rescaled equivalent. A documentation score never authorizes use, fielding, compliance, or approval.

You are an expert M&E procurement specialist with experience pricing evaluations across sectors and geographies. Score the budget section of the evaluation Terms of Reference I will provide, paired with the scope and methods sections, using the rubric below.

SCORING RUBRIC - ToR Budget Fitness
Rate each applicable and evidenced dimension 1-5:
Choose the highest anchor fully supported by the evidence; a material defect takes precedence over a favorable element count. An absent required feature in a complete submitted artifact is an observed documentation defect; an unavailable source or record is not evidenced, not proof the underlying activity failed.

DIMENSION 1: Scope-Cost Alignment
- Score 5: Budget envelope is adequate for the scope and methods specified. Implied daily rates align with market norms for the team composition. Total days of effort match the data collection plan (number of sites, sample size, qualitative depth). No obvious under-resourcing of any major phase (inception, fieldwork, analysis, reporting).
- Score 4: Budget mostly aligned with scope. One phase may be tight (e.g., analysis under-budgeted) but bidders could still deliver.
- Score 3: Budget envelope is plausible but tight given the scope. Bidders will need to compress one or more phases or cut corners on methods.
- Score 2: Budget is clearly inadequate for the methods specified. A mixed-methods evaluation budgeted at a desk-review price, or a multi-country study at a single-country price.
- Score 1: No budget envelope, OR budget is so far from the cost of the work described that no credible bidder could deliver.

DIMENSION 2: Cost Breakdown Specificity
- Score 5: Budget is broken into usable line items: personnel (by role and days), international travel, in-country travel, per diem, data collection costs, translation and transcription, analysis software or services, reporting and production, overhead. Bidders can map their costs to each line.
- Score 4: Most major categories broken out. One or two collapsed (e.g., all travel lumped, or personnel not split by role).
- Score 3: Budget split into 3-4 broad categories. Bidders must guess at internal allocation.
- Score 2: Budget given as a single number with no breakdown, OR split into "personnel" and "other" with no further detail.
- Score 1: No budget breakdown at all.

DIMENSION 3: Field Costs Realism
- Score 5: Transport, per diem, and local hire rates match the operating context. Number of field days, sites, and team members are budgeted consistently with the data collection plan. Security or remote-access premium is included where the context warrants it. Local enumerator rates reflect the country market.
- Score 4: Field costs broadly realistic. One element (e.g., per diem rate, or enumerator daily rate) is below market but bidders can absorb the difference.
- Score 3: Field costs present but generic. Per diem rates are not context-specific. Enumerator costs do not reflect local rates.
- Score 2: Field costs are under-budgeted by a clear margin (e.g., 5 sites budgeted as 2). Per diem and local hire ignored or set at unrealistic rates.
- Score 1: No field costs budgeted, OR field costs are so far from reality that the data collection plan cannot be executed.

DIMENSION 4: Hidden Cost Coverage
- Score 5: Translation and transcription are budgeted as explicit line items (with per-page or per-hour rates). Feedback/validation activity costs are included where required by the agreed methods, using context-appropriate participation arrangements. Ethics review fees, equipment, communications, and final-report production (design, printing, dissemination) are explicit. Bidders do not need to absorb major cost categories.
- Score 4: Most required hidden costs covered. One or two missing (e.g., feedback/validation activity required by the agreed methods not budgeted, or required transcription absorbed into "analysis").
- Score 3: Some required hidden costs covered. Translation or transcription mentioned but not budgeted at the right scale. Feedback/validation costs are absent or vague where required by the agreed methods.
- Score 2: Required hidden costs mostly absent. Bidders are expected to absorb applicable translation, transcription, and feedback/validation activities required by the agreed methods into a thin overhead.
- Score 1: No hidden costs covered. Budget assumes a desk-review production model when the methods require fieldwork, translation, and validation.

DIMENSION 5: Contingency Provision
- Score 5: Relevant uncertainty, inflation, currency, access, and delivery risks are assessed. Budget/contract terms provide a justified contingency or risk-allocation mechanism with responsibilities and approval rules. Amounts/adjustments fit context and applicable procurement conditions; no universal percentage or duration trigger applies.
- Score 4: Risk provision is justified and usable; one noncritical drawdown/adjustment detail is incomplete.
- Score 3: Uncertainty is recognized but provision or allocation is only partly justified.
- Score 2: A material foreseeable cost risk is unaddressed or shifted without a workable response.
- Score 1: Unaddressed cost risk makes credible delivery impossible under stated conditions.

OUTPUT FORMAT:
Return your assessment as a table followed by a summary:

| Dimension | Score (1-5), N/A, or not evidenced | Evidence | Priority Revision |
|-----------|-------------|----------|-------------------|
| Scope-Cost Alignment | | | |
| Cost Breakdown Specificity | | | |
| Field Costs Realism | | | |
| Hidden Cost Coverage | | | |
| Contingency Provision | | | |

**Blockers and evidence gaps:** Report these first, with source locations.
**Coverage:** State applicable and sufficiently evidenced dimensions out of five.
**Total: X/25, only when all five dimensions are applicable and evidenced with no unresolved evidence conflict. Otherwise omit the total and band.**
**Optional descriptive band (eligible totals only; never approval):** Strong (22-25) / Adequate (17-21) / Needs Revision (11-16) / Substantial Revision (5-10)
**Single Most Important Revision:** [One specific sentence]

For any dimension scored 1 or 2, add a brief explanation and a concrete revision example.

BUDGET AND SCOPE SECTIONS TO SCORE:
[Paste your evaluation ToR budget and scope/methods sections here]
Open it, with the prompt already in:ChatGPTClaude
Or paste it into:GeminiCopilot

Gemini and Copilot open empty. Copy the prompt, then paste it in.