Customize: Evaluation Management Arrangements

Decide what to keep, what to fork and what to add, then take away an AI review prompt. Change nothing and you get the published prompt exactly as it stands.

Describe your purpose, work stage, intended users and available evidence in ordinary language. Leave blank to use the populated starting rubric. Missing records remain evidence requests.

Several lets you run one check at a time, and keeps each one short enough to open in an assistant.

Your Prompt

This is the published prompt, unchanged.

Evaluation Management Arrangements

6,941 characters
Establish the document purpose, design, stage, applicable requirements, and available source evidence before rating. Distinguish N/A with a reason, not evidenced, unresolved conflicting evidence, and observed inadequate performance. Missing records do not prove an activity did not occur. Missing records alone justify evidence requests and a deferred readiness decision, not an inferred failure or mandatory repeat activity. Do not invent documentary, signature or approval requirements. Cite document locations for every finding. Keep supported facts separate from proposals, assumptions, and illustrative examples. Never invent completed fieldwork, validation, consent, approval, values, dates, quotations, or assigned ownership. Label unconfirmed owners and proposed revisions for confirmation. Report blocking ethics, safety, confidentiality, measurement-validity, or inference failures first regardless of scores. Give a total and band only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict; otherwise show the dimension profile, coverage, and evidence requests without a total, band, or rescaled equivalent. A documentation score never authorizes use, fielding, compliance, or approval.

You are an expert M&E governance specialist. Score the evaluation management arrangements section of the document I will provide using the rubric below.

SCORING RUBRIC - Evaluation Management Arrangements
Rate each applicable, evidenced dimension 1-5. Choose the highest anchor fully supported by the evidence; a material defect takes precedence over a favorable element count. An absent required feature in a complete submitted artifact is an observed documentation defect; an unavailable source or record is not evidenced, not proof the underlying activity failed.

DIMENSION 1: Steering Committee Composition
- Score 5: The governance structure is proportionate to scope and risk. Where a steering committee is justified, relevant representation, technical/decision roles, chair function, and practical size are explained. Alternative arrangements can satisfy the same functions.
- Score 4: Most necessary governance functions and roles are clear; a minor representation or operating detail is incomplete.
- Score 3: Governance is partly specified but decision roles or proportionality are unclear.
- Score 2: Needed governance functions are missing or authority is materially ambiguous.
- Score 1: Governance cannot support required decisions or independence. A separate committee is not mandatory for every evaluation.

DIMENSION 2: Reference Group Role
- Score 5: Technical advice and challenge are proportionate to the evaluation. Where a reference group is justified, purpose, expertise, engagement points, and separation from decision rights are clear. An alternative can perform these functions.
- Score 4: Most needed advisory functions are clear; one role or engagement detail is incomplete.
- Score 3: Technical advice is planned but its purpose, independence, or timing is unclear.
- Score 2: Necessary technical advice is absent or its governance role is materially confused.
- Score 1: A needed advisory safeguard is absent or falsely claimed. A separate reference group can be N/A with reason.

DIMENSION 3: Decision Rights
- Score 5: All 4 elements: ToR amendment authority assigned, methodology change authority assigned (e.g., who approves shifts in scope or methods during inception or fielding), final report sign-off authority assigned, and budget variance authority assigned with thresholds (e.g., use the variance limits and approval authority in the applicable agreement or policy, with source and version).
- Score 4: Three of four elements adequately specified; the remaining element incomplete: ToR, methodology, and sign-off assigned; budget variance partial.
- Score 3: Two of four elements adequately specified; the others incomplete. Sign-off assigned but ToR or methodology change authority unclear.
- Score 2: One element present. Decision rights left to ad hoc discussion.
- Score 1: No decision rights specified. Authority unclear.

DIMENSION 4: Conflict of Interest Management
- Score 5: All 4 elements: Conflict-of-interest declaration required from all evaluators and steering committee members, scope of declared interests defined (financial, professional, personal, prior engagement with the program), recusal procedures specified (when a declared interest triggers recusal from specific decisions), and a designated body or role reviews declarations.
- Score 4: Three of four elements adequately specified; the remaining element incomplete: Declaration and recusal procedures specified; scope or review body partial.
- Score 3: Two of four elements adequately specified; the others incomplete. Declaration required but recusal procedures vague.
- Score 2: COI referenced as a checkbox without procedures.
- Score 1: No conflict-of-interest management.

DIMENSION 5: Escalation Path
- Score 5: All 4 elements: Dispute scenarios identified (evaluator-commissioner disagreement on findings, intra-committee dispute, donor concerns), first-line resolution mechanism named (e.g., chair mediation, structured discussion at next steering meeting), escalation to a higher body specified if first-line fails (e.g., donor program officer, independent reviewer), and timeline for resolution stated.
- Score 4: Three of four elements adequately specified; the remaining element incomplete: Scenarios and first-line resolution specified; escalation or timeline partial.
- Score 3: Two of four elements adequately specified; the others incomplete. Some scenarios identified but resolution mechanism generic.
- Score 2: Dispute resolution referenced without mechanism.
- Score 1: No escalation path.

OUTPUT FORMAT:
Return your assessment as a table followed by a summary:

| Dimension | Score (1-5), N/A, or Not Evidenced | Evidence from Management Arrangements | Priority Revision |
|-----------|-------------|--------------------------------------|-------------------|
| Steering Committee Composition | | | |
| Reference Group Role | | | |
| Decision Rights | | | |
| Conflict of Interest Management | | | |
| Escalation Path | | | |

First report blocking issues, unresolved conflicts, applicability and evidence coverage. Only if all five dimensions are applicable and sufficiently evidenced with no unresolved source conflict, report **Total: X/25** and **Band:** Strong (22-25) / Adequate (17-21) / Needs Revision (11-16) / Substantial Revision (5-10), as a secondary documentation summary. Otherwise omit both total and band; report the dimension profile and evidence requests without rescaling.
**Single Most Important Revision:** [One specific sentence]

For any dimension scored 1 or 2, add a brief explanation and a concrete revision example.

EVALUATION MANAGEMENT ARRANGEMENTS TO SCORE:
[Paste your evaluation management arrangements section here]
Open it, with the prompt already in:ChatGPTClaude
Or paste it into:GeminiCopilot

Gemini and Copilot open empty. Copy the prompt, then paste it in.