Governing evidence and applicability rules (take precedence over aggregate bands): establish the document purpose, design, stage and available evidence before rating. A fit-for-purpose single-method design can earn the highest applicable rating; do not require complexity, mixed methods or two sources for every finding. Distinguish applicable, not applicable with reason, not evidenced, and observed inadequate. Report applicable coverage and the raw denominator. If any dimension is N/A or not evidenced, report the profile and gaps without a 25-point band or an unvalidated rescaled equivalent. Never interpret missing documentation as proof no activity occurred. Use source-linked historical facts only; keep proposed work and illustrative examples separate. Preserve unresolved source conflicts. Do not invent baseline values, quotations, fieldwork, pilots, validation, consent or approvals to improve a score. A serious consent, confidentiality, safeguarding, measurement-validity or unsupported-inference failure is a blocking issue regardless of the total, including 22/25. High document-quality scores do not establish legal compliance, instrument readiness, field authorization or donor approval. Accountable human review against the applicable protocol is separate. A well-documented failed pilot may score 25/25 for documentation while remaining not ready for fielding.
Use This Rubric
Bring: the activity design, context-specific risk assessment, mitigation responsibilities, escalation contacts, and safeguarding requirements.
Stage: State whether this is a proposed design, a draft, or a report of completed work. Assess planned procedures as plans; require records before claiming they occurred. A complete submitted document can have an observed documentation defect even when the underlying activity is unknown.
Limits: Apply requirements to the stated purpose, methods, population, and risk. Do not impose extra methods or sensitive data collection solely to increase a score. These editorial anchors are provisionally checked, not practitioner-calibrated.
Scoring Criteria
All four risk types are considered. Physical risks named (injury, exposure to violence, transport hazards, communicable disease, exhaustion). Psychological risks named (re-traumatization, distress from sensitive topics, stigma triggered by participation). Social risks named (community backlash, family conflict, loss of standing, retaliation from authorities or armed actors). Economic risks named (opportunity cost of time, loss of livelihood access, perceived favoritism that affects future aid). Risks named separately for participants, communities, and data collection teams.
At least three risk types considered. Participant-side coverage strong; team-side or community-side risks partial.
Two risk types addressed (commonly physical and psychological). Social or economic risks absent.
One risk type addressed in detail; others not named.
No risk identification across types.
Risks particular to the operating context are named with specificity (active conflict, post-conflict transition, surveillance environments, refugee or IDP contexts, gender-based violence settings, repressive political environments, contested ethnic or religious settings). The protocol names how each context-specific risk applies to this activity. Local actors and dynamics that elevate risk are identified (armed groups, hostile authorities, gatekeepers, dominant clan or caste structures). Risks specific to marginalized identities in this context are addressed.
At least three context elements addressed. Conflict, marginalization, or surveillance considered; local actor mapping or identity-specific risks partial.
Context referenced but risks remain generic. Local actors not named.
Context mentioned in passing. No risk implications drawn.
No context-specific risk consideration.
Each identified risk has a named mitigation step that is concrete and operational (not a principle). Mitigation is matched to risk severity and likelihood (greater risk receives stronger mitigation). Mitigation includes preventive measures (interviewer matching, neutral location, omission of high-risk questions) and reactive measures (referral pathway, support contact, withdrawal). Mitigation responsibilities are named (who does what). Mitigation steps are feasible given the team, budget, and context.
At least four elements present. Mitigation specific and matched to risk; responsibility assignment or feasibility partial.
Generic mitigation language. Some risks have a concrete step; others have a principle.
Mitigation listed as a principle ("we will minimize harm"). No concrete steps tied to risks.
No mitigation specified.
Incident categories are defined (what counts as a safeguarding incident, a security incident, a participant distress event). For each category, escalation steps are specified (who is contacted, on what timeline, by what channel). Immediate-response steps are specified (what the team does in the first hour, before escalation completes). A confidential reporting channel exists (so that team members and participants can raise concerns without retaliation). Documentation of incidents is required, with named responsibility for follow-up.
At least four elements present. Escalation paths and immediate response clear; reporting channel or documentation partial.
Escalation mentioned but timelines or contacts unclear. Immediate response not specified.
General "report incidents to manager" language. No timelines, no immediate response, no confidential channel.
No escalation or response procedures.
Risk re-assessment is scheduled at named points in the activity timeline (pre-fielding security check, mid-activity review, after-incident review, post-activity debrief). Triggers for ad-hoc re-assessment are named (security incident, contextual change, participant complaint). The team has a named role responsible for risk monitoring through the activity. Findings from re-assessment feed back into the protocol (the protocol is updated, not just reviewed). Risk monitoring is documented.
At least four elements present. Scheduled re-assessment and triggers in place; role assignment or documentation partial.
Risk monitoring stated as intention. No schedule, no triggers, no named role.
Risk treated as a one-time design step. No monitoring through implementation.
No risk monitoring.
Score Interpretation
Report blockers, the dimension profile, and evidence coverage first. Use these aggregate bands only when all five dimensions are applicable and sufficiently evidenced with no unresolved evidence conflict. Otherwise give no total, band, or rescaled equivalent. High documentation quality does not establish readiness, legal compliance, or approval.
| Total (out of 25) | Band | Next Step |
|---|---|---|
| 22-25 | Strong | Strong documentation profile only. Resolve blocking issues and obtain the applicable human review; this score does not authorize use. |
| 17-21 | Adequate | Prioritize source-linked revisions in the weakest dimensions. Request missing records before proposing additional activity; confirm the need for any new work from evidence. |
| 11-16 | Needs Revision | Use located findings as a revision brief. Distinguish reporting gaps from demonstrated design or implementation failures and label proposed work for confirmation. |
| 5-10 | Substantial Revision | Rework the evidence-backed weaknesses with accountable review. A low documentation profile alone does not establish that the underlying activity failed or must be repeated. |