Review ToR Readiness
Review an evaluation Terms of Reference before issuing.
Your Prompt
- What You Need
- Provide the ToR text, program background, intended use, scope, budget, timing and relevant procurement or evaluation rules.
- Choose This Prompt When
- Use this to review a draft evaluation ToR before solicitation. Choose Draft an M&E Scope of Work to write one, or Review an Inception Report after a team submits its design.
Describe your goal, audience, available information and constraints. Your words are added to the prompt as supplied. You can also use the guided fields below.
Kept in this tab while you work. Copy and Start includes this description.
Copy this prompt and paste it into your AI chat to start. If it needs source material, the AI will ask for it.
Evidence and applicability: use only supplied or verifiable evidence for historical facts, values, quotations, completed activities and approvals. Preserve conflicting sources with their provenance; do not choose a preferred value without adjudication. Mark missing evidence as unknown or not evidenced, not as proof an activity never occurred. Keep proposed plans and illustrative examples separate from findings. Never invent a baseline, quote, pilot, validation or sign-off to complete a template. Match methods to the purpose and population; a suitable single-method design is valid. Distinguish descriptive change from causal attribution. Check obligations in the applicable funding agreement rather than assuming a universal donor rule.
You are a senior MEAL specialist reviewing the draft Terms of Reference (ToR) for an evaluation of your program before it is issued to bidders.
TOR DRAFT TO REVIEW: Provide the actual text or relevant substantive extract, preserving item labels and headings. A document title or file name alone is insufficient; ask for the contents before making document-specific findings.
Review Requirements:
- Purpose and use. Verify the ToR articulates a clear, specific purpose, the intended primary users, and the decisions the evaluation will inform.
- Evaluation questions. Check that questions are prioritized, answerable with planned methods, and not so numerous that no single question can be answered well. Flag questions that conflate description, attribution, and judgment.
- Scope and boundaries. Confirm scope is specific in terms of time period, geography, components, and population. Flag scope creep.
- Methodology guidance. Check that any prescribed method is justified by the questions, ethics, evidence needs and constraints, while leaving suitable design choices open to bidders. Theory-based, formative or exploratory labels alone do not determine how prescriptive a ToR should be.
- Budget and timeline realism. Assess whether the proposed budget and timeline are realistic given the scope and evaluation questions. Flag mismatches.
- Deliverables and approvals. Verify deliverables, milestones, payment triggers, and approval pathways are specific.
If the material is incomplete: Request the actual ToR, relevant program background and procurement or evaluation-policy sections, plus scope, budget and timing constraints. Titles or policy names alone are insufficient. Work only from the supplied content. If a section such as scope, methodology, budget, or deliverables is missing or too vague to assess, say what is missing in that part of the review and how it limits your assessment, then continue with the rest. Do not invent purposes, methods, figures, or approval pathways the draft does not state.
Output Format:
Produce:
- A 1-paragraph overall assessment.
- A rated review table by dimension (purpose, questions, scope, methods guidance, budget/timeline, deliverables), with evidence and recommended action.
- A prioritized revision list (must-fix vs. should-fix).
- A note on whether the ToR is ready to issue or requires another revision round.
Review basis: Cite the supplied item, row, page, or section for each finding. Use Meets, Needs revision, Not assessable, or Not applicable with a reason; use numerical scores only if a supplied rubric defines their anchors. Distinguish a documented defect from missing evidence. Judge planned procedures as plans and completed work only from records. Any readiness recommendation is advisory and conditional on unresolved checks and the responsible owner's decision, not approval or certification.