M&E StudioTools

SMART Criteria Check

SMART Criteria Check: Your prompt

You are an expert M&E specialist with deep experience reviewing indicators across logframes, MEL plans, PIRS, and results frameworks. Score the indicator or set of indicators I have attached or pasted against the SMART criteria using the rubric below. The input may be a single indicator statement or a list of indicators extracted from a logframe, MEL plan, PIRS, or other M&E document.

SCORING RUBRIC - SMART Criteria Check

Score each dimension 1-5 using these criteria:

DIMENSION 1: Specific

5All elements present. The subject is named clearly (who or what is being measured). The quality being captured is unambiguous (e.g., "completion" defined, "improved" operationalized). The population is bounded (e.g., women aged 15-49 in target districts). No room for different interpretations across staff or sites.
4Most elements present. Subject and quality are clear; population is implied but not stated, or one term is slightly ambiguous.
3Indicator is broadly understandable but a key term ("strengthened", "improved", "supported") is not operationalized. Population is generic.
2Subject or quality is vague. Multiple plausible interpretations across reviewers.
1Absent or inadequate. Indicator reads as a slogan, theme, or result statement rather than something that names a specific thing to measure.

DIMENSION 2: Measurable

5All elements present. The indicator is quantifiable (number, percentage, ratio, score) or systematically observable against a defined rubric or checklist. A clear unit is implied (people, households, events). The value produced is comparable across time periods and sites.
4Most elements present. Quantifiable but unit is implicit, or the observation method is named but not standardized.
3Indicator can be measured in principle but lacks a clear unit or scoring approach. Comparability across periods would require additional definition work.
2Indicator is qualitative aspiration with no observable referent (e.g., "stakeholders feel ownership"). No measurement approach implied.
1Absent or inadequate. Indicator is purely aspirational language with no path to measurement.

DIMENSION 3: Achievable

5All elements present. The target embedded or implied is realistic given the program's scale, capacity, geography, and timeline. The indicator is within the implementer's sphere of influence (not entirely dependent on external actors). Resources for measurement are plausible. Comparable programs in similar contexts have demonstrated reachable values at similar levels.
4Most elements present. Realistic at the program scale, but one assumption (capacity, external actor, measurement cost) is unexamined.
3Plausibly achievable but ambition is unclear. The target level depends on conditions that are not addressed.
2Indicator depends heavily on factors outside the implementer's control or sets a level not seen in comparable work.
1Absent or inadequate. Indicator is unrealistic given scale, capacity, or timeframe, or measures a result the program cannot plausibly produce.

DIMENSION 4: Relevant

5All elements present. The indicator measures the result level it claims (output indicator measures an output, outcome indicator measures an outcome, impact indicator measures impact). It connects logically to the result statement it sits under. It is not a proxy displaced from its actual level (e.g., counting trainings to "measure" capacity).
4Most elements present. Level is mostly correct; one indicator slips down a level or uses a partial proxy.
3Result-chain level is inconsistently applied. Some indicators are mis-leveled or measure activity proxies for higher-level results.
2Indicator does not match its claimed result level (e.g., labelled as "outcome" but measures activity completion).
1Absent or inadequate. Indicator is disconnected from the result it sits under or from the program logic entirely.

DIMENSION 5: Time-bound

5All elements present. A measurement schedule is specified (baseline, midline, endline, or a stated cadence such as quarterly or annually). A target date or end-of-project deadline is named where applicable. Reporting points align with the program's decision cycle.
4Most elements present. Schedule named but a deadline is missing, or a deadline is named without a measurement cadence.
3General timing implied ("annually", "during the project") but no specific schedule or deadline.
2Timing is vague or referenced only in the broader plan, not at the indicator level.
1Absent or inadequate. No measurement schedule, cadence, or deadline associated with the indicator.

OUTPUT FORMAT:

Return your assessment as a table followed by a summary:

DimensionScore (1-5)EvidencePriority Revision
Specific
Measurable
Achievable
Relevant
Time-bound

Total: X/25 Band: Strong (22-25) / Adequate (17-21) / Needs Revision (11-16) / Substantial Revision (5-10) Single Most Important Revision: [One specific sentence]

For any dimension scored 1 or 2, add a brief explanation and a concrete revised indicator statement.

If multiple indicators are provided, score each one separately and then report a portfolio summary identifying which indicators are strongest, which need revision, and which should be rebuilt or dropped.

INDICATOR(S) TO SCORE:

(See the attached or pasted document.)

Document to review: Attached, or pasted below. Base everything above on it and do not invent details that are not in it.

Rubric · Review a Document · about 880 words

Score one or more indicators specifically against the SMART criteria (Specific, Measurable, Achievable, Relevant, Time-bound).

You'll Need

Your indicator(s)

You Get Back

A score from 1 to 5 for each of the 5 criteria, a total out of 25 and the one revision that matters most

Criteria