ToR Budget Fitness: Your prompt

You are an expert M&E procurement specialist with experience pricing evaluations across sectors and geographies. Score the budget section of the evaluation Terms of Reference I have attached or pasted, paired with the scope and methods sections, using the rubric below.

SCORING RUBRIC - ToR Budget Fitness

Score each dimension 1-5 using these criteria:

DIMENSION 1: Scope-Cost Alignment

5Budget envelope is adequate for the scope and methods specified. Implied daily rates align with market norms for the team composition. Total days of effort match the data collection plan (number of sites, sample size, qualitative depth). No obvious under-resourcing of any major phase (inception, fieldwork, analysis, reporting).
4Budget mostly aligned with scope. One phase may be tight (e.g., analysis under-budgeted) but bidders could still deliver.
3Budget envelope is plausible but tight given the scope. Bidders will need to compress one or more phases or cut corners on methods.
2Budget is clearly inadequate for the methods specified. A mixed-methods evaluation budgeted at a desk-review price, or a multi-country study at a single-country price.
1No budget envelope, OR budget is so far from the cost of the work described that no credible bidder could deliver.

DIMENSION 2: Cost Breakdown Specificity

5Budget is broken into usable line items: personnel (by role and days), international travel, in-country travel, per diem, data collection costs, translation and transcription, analysis software or services, reporting and production, overhead. Bidders can map their costs to each line.
4Most major categories broken out. One or two collapsed (e.g., all travel lumped, or personnel not split by role).
3Budget split into 3-4 broad categories. Bidders must guess at internal allocation.
2Budget given as a single number with no breakdown, OR split into "personnel" and "other" with no further detail.
1No budget breakdown at all.

DIMENSION 3: Field Costs Realism

5Transport, per diem, and local hire rates match the operating context. Number of field days, sites, and team members are budgeted consistently with the data collection plan. Security or remote-access premium is included where the context warrants it. Local enumerator rates reflect the country market.
4Field costs broadly realistic. One element (e.g., per diem rate, or enumerator daily rate) is below market but bidders can absorb the difference.
3Field costs present but generic. Per diem rates are not context-specific. Enumerator costs do not reflect local rates.
2Field costs are under-budgeted by a clear margin (e.g., 5 sites budgeted as 2). Per diem and local hire ignored or set at unrealistic rates.
1No field costs budgeted, OR field costs are so far from reality that the data collection plan cannot be executed.

DIMENSION 4: Hidden Cost Coverage

5Translation and transcription are budgeted as explicit line items (with per-page or per-hour rates). Validation workshops are budgeted with venue, participant per diem, and facilitator time. Ethics review fees, equipment, communications, and final-report production (design, printing, dissemination) are explicit. Bidders do not need to absorb major cost categories.
4Most hidden costs covered. One or two missing (e.g., validation workshop not budgeted, or transcription absorbed into "analysis").
3Some hidden costs covered. Translation or transcription mentioned but not budgeted at the right scale. Validation absent or vague.
2Hidden costs mostly absent. Bidders are expected to absorb translation, transcription, and validation into a thin overhead.
1No hidden costs covered. Budget assumes a desk-review production model when the methods require fieldwork, translation, and validation.

DIMENSION 5: Contingency Provision

5Contingency line item is included at a rate appropriate for the context (typically 5-10 percent of total, higher in fragile or remote settings). A rule is stated for when contingency can be drawn down (e.g., requires written justification and approval). Currency or inflation adjustment provisions are noted if the project spans more than 12 months.
4Contingency line present at an appropriate rate. Drawdown rule absent or thin.
3Contingency mentioned but not a separate line item, OR rate is too low for the context (e.g., 2 percent for a remote fragile-context evaluation).
2No contingency budgeted. Bidders must absorb all unplanned costs.
1No contingency, AND budget is already tight against scope, meaning any disruption forces method compromises.

OUTPUT FORMAT:

Return your assessment as a table followed by a summary:

DimensionScore (1-5)EvidencePriority Revision
Scope-Cost Alignment
Cost Breakdown Specificity
Field Costs Realism
Hidden Cost Coverage
Contingency Provision

Total: X/25 Band: Strong (22-25) / Adequate (17-21) / Needs Revision (11-16) / Substantial Revision (5-10) Single Most Important Revision: [One specific sentence]

For any dimension scored 1 or 2, add a brief explanation and a concrete revision example.

BUDGET AND SCOPE SECTIONS TO SCORE:

(See the attached or pasted document.)

Document to review: Attached, or pasted below. Base everything above on it and do not invent details that are not in it.

Rubric · Review a Document · about 882 words

Score whether the budget in an evaluation Terms of Reference is fit for the scope and methods.

You'll Need

Your evaluation ToR budget and scope/methods sections

You Get Back

A score from 1 to 5 for each of the 5 criteria, a total out of 25 and the one revision that matters most

Criteria

This Rubric